Method Statement: Blind Lifting Operations into Deep Shafts or Building Interiors inspection and test plan example.

Inspection and Test Plan for Method Statement: Blind Lifting Operations into Deep Shafts or Building Interiors

AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.

Published 09 Oct 2026 Rev. 00 11 views 3 downloads
About this ITP: This ITP defines inspections and tests for blind lifting: planning approvals, ground checks, equipment certifications, comms and camera tests, trial and execution stages.

More than a static template

Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.

  • AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
  • Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
  • Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
  • Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.

What you can customize

When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:

  • Inspection activity — Description of what is being inspected.
  • Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
  • Responsibility — Contractor, subcontractor, engineer, or client.
  • Frequency — How often the inspection occurs.
  • Acceptance criteria — Referenced standard or specification requirement.
  • Records — Forms, test reports, or checklists required as evidence.

Why this ITP is used

To verify that all safety-critical controls for blind lifting are inspected, tested, and documented before and during operations.

Who uses this inspection and test plan

Appointed Person, Lifting Supervisor, HSE, Crane Operator, RF/Camera Technicians, and Client Representatives.

When this ITP is prepared and submitted

Before mobilization, prior to each lift, during execution, and after demobilization for records.

Who receives or approves this ITP

Principal Contractor and Client Representative for approval.

Inspection scope

Covers planning approvals, ground preparation, crane/rigging certification, comms and camera commissioning, anti-collision setup, trial lift, execution, and post-lift checks.

Typical hold, witness, and review points

Trial lift (Hold), blind lift execution (Witness), anti-collision test (Witness), final acceptance (Review).

Typical inspection records

Lift Plan, checklists, calibration sheets, RF logs, anti-collision setup, trial lift record, weather logs, photo/video evidence.

Important approval note

This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.

Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.

Inspection and test plan

Activity Inspection / Test Acceptance Criteria Responsibility Record
Lift Plan and Risk Assessment Approval Document review and sign-off Approved plan with calculations and drawings Appointed Person / Client Rep Approved Lift Plan, RA/MS
Ground Bearing & Pad Installation Level survey; bearing verification/plate test if required Level within ±10 mm; allowable bearing ≥ design AP / Supervisor Pad Inspection Report
Crane Certification & Pre-use Check Visual and functional tests per OEM No defects; certificates valid Crane Operator / HSE Daily Checklist, Certs
Rigging Gear Inspection Visual inspection; certificate verification Per ASME B30.9/30.26; tags legible Lifting Supervisor / Slinger Rigging Register
Boom-tip Camera Installation Physical mounting check; feed latency check Secure mount; latency ≤ 200 ms [Verify] Camera Technician / Supervisor Install Photos/Checklist
Camera Calibration 3-point calibration against target grid Error ≤ ±50 mm [Verify] Camera Technician / AP Calibration Sheet
Radio Repeater Setup & Test Coverage and intelligibility test; dropout/latency check ≥ 95% intelligibility; <1 s dropout; ≤ 300 ms latency [Verify] RF Technician / Lifting Supervisor RF Test Log & Map
Secondary Spotter Stations Guardrail/anchor inspection; sightline test Compliant edge protection; unbroken sightline Supervisor / HSE W@H Permit, Inspection
Anti-collision & LMI Setup Virtual wall approach test; A2B test Alarm/stop at programmed limits; A2B functional AP / Operator Anti-collision Setup Sheet
Tag Line Preparation Attachment and condition check Non-conductive; secure fix; no damage Slinger/Signaller Rigging Checklist
Pre-lift Briefing & Comms Drill Radio check all nodes; hand signal rehearsal 100% pass; attendance signed Lifting Supervisor TBT/Briefing Record
Trial Lift 100–200 mm hover; stability and control check No slippage; load within plan; controls effective Operator / Supervisor Trial Lift Record
Blind Lift Execution Heartbeat comms; video monitoring; waypoint pauses No contact; speed ≤ 0.3 m/s [Verify]; within path Operator / Signaller / Spotters Lift Log; Video
Landing & Post-lift Inspection Load alignment and stability check; equipment check Set-down within ±25 mm [Verify]; no damage Supervisor / Slinger Set-down Checklist; Post-inspection

This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.

Frequently asked questions

Achieve at least 95% intelligibility throughout the shaft/interior with no single dropout exceeding 1 second and acceptable latency per plan.

After any change to crane configuration, radius, or proximity to obstacles, and at the start of each shift.

Related method statement

This Inspection and Test Plan is associated with the Method Statement: Blind Lifting Operations into Deep Shafts or Building Interiors method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.

View the Method Statement: Blind Lifting Operations into Deep Shafts or Building Interiors method statement →

Continue with related inspection, method statement, article, and checklist resources.

Related resources