G
Guest

Method Statement: Pump-Applied Screed Works (Multi-Level Projects) inspection and test plan example.

Inspection and Test Plan for Method Statement: Pump-Applied Screed Works (Multi-Level Projects)

AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.

Published 08 Nov 2026 Rev. 00 2 views
About this ITP: This ITP defines inspections and tests for pump-applied screed on multi-level projects, including substrate acceptance, flow/slump, SR, levels, thickness, strength, and moisture hold points.

More than a static template

Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.

  • AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
  • Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
  • Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
  • Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.

What you can customize

When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:

  • Inspection activity — Description of what is being inspected.
  • Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
  • Responsibility — Contractor, subcontractor, engineer, or client.
  • Frequency — How often the inspection occurs.
  • Acceptance criteria — Referenced standard or specification requirement.
  • Records — Forms, test reports, or checklists required as evidence.

Why this ITP is used

To verify screed materials and workmanship meet contract and standards, ensuring readiness for final floor finishes.

Who uses this inspection and test plan

Site Engineer, QA/QC Engineer, Client/Consultant, Screed Subcontractor, and Third-Party Lab.

When this ITP is prepared and submitted

From pre-pour substrate inspection through curing to final moisture test and release to flooring trades.

Who receives or approves this ITP

Client/Consultant Representative for hold/witness point attendance and acceptance.

Inspection scope

Covers equipment checks, material verification, in-process testing, SR/level survey, thickness and strength checks, and moisture testing before finishes.

Typical hold, witness, and review points

Substrate readiness (H), initial flow (H/W), level pins (W), SR survey (W), pre-flooring moisture test (H).

Typical inspection records

ITR forms, delivery/CoC, flow logs, level/SR maps, test reports (strength/ISCR/pull-off), moisture reports, curing logs, NCR/CAR, acceptance certificates.

Important approval note

This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.

Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.

Inspection and test plan

Activity Inspection / Test Acceptance Criteria Responsibility Record
Substrate and perimeter isolation inspection [HOLD POINT] Visual and cleanliness check Sound, clean substrate; isolation/joints installed; DPM/slip membrane continuous SE/QA/Client ITR; photos; checklist
UFH pressure test verification (if applicable) Gauge reading/time log Test pressure held without loss [Verify per project] MEP/QA UFH test certificate
Equipment and hose integrity check Visual + low-pressure trial No leaks; safety devices fitted Supervisor/Pump Operator Pump checklist
Level datum transfer and pin setting [WITNESS POINT] Laser level spot checks Pins within +5/−3 mm of design elevation Survey/SE/Client Level records
Initial flow/slump verification [HOLD/WITNESS] Flow ring/slump per TDS Within target range; no segregation/bleed QA/QC & Client Field test log
Ongoing flow/slump monitoring Periodic tests each 20–30 min/20 m3 Within target throughout pour QA/QC Field test log
Placement workmanship and segregation check Visual checks during pour Uniform matrix; no sand pockets or bleed Supervisor/QA Daily report; NCR if any
Level tolerance verification during pour Spot levels at pins/grid ±5 mm from datum [Verify] SE/QA Level sheet
Curing/protection inspection Visual; timing log Protection installed; drying regime per TDS Supervisor/QA Curing log
Surface Regularity (SR) survey [WITNESS POINT] 2 m straightedge on 2 m grid Meets SR1/SR2/SR3 as specified QA/QC & Client SR map/report
Thickness verification (spot cores/edges) Measure cores/edges +10/−5 mm or per spec QA/QC Thickness log
Strength/ISCR/pull-off (if specified) Lab/field tests Meets class and category per spec QA/QC/Lab Test reports
Moisture test prior to finishes [HOLD POINT] In-situ RH or CM Within finish manufacturer limit (e.g., ≤75% RH) QA/QC & Client Moisture test report
Final area acceptance/release to flooring Document review and walkdown All ITP stages closed; no defects Client/Consultant Area acceptance certificate

This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.

Frequently asked questions

Only if the contract allows and the Engineer approves. Maintain consistent methodology across the project and align with the flooring manufacturer’s requirements.

Not always. It is specified when the floor duty classification requires it. Check project specifications for the need and frequency.

Related method statement

This Inspection and Test Plan is associated with the Method Statement: Pump-Applied Screed Works (Multi-Level Projects) method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.

View the Method Statement: Pump-Applied Screed Works (Multi-Level Projects) method statement →

Related resources