Inspection and Test Plan for Method Statement: Pump-Applied Screed Works (Multi-Level Projects)
AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.
More than a static template
Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.
- AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
- Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
- Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
- Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.
What you can customize
When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:
- Inspection activity — Description of what is being inspected.
- Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
- Responsibility — Contractor, subcontractor, engineer, or client.
- Frequency — How often the inspection occurs.
- Acceptance criteria — Referenced standard or specification requirement.
- Records — Forms, test reports, or checklists required as evidence.
Why this ITP is used
To verify screed materials and workmanship meet contract and standards, ensuring readiness for final floor finishes.
Who uses this inspection and test plan
Site Engineer, QA/QC Engineer, Client/Consultant, Screed Subcontractor, and Third-Party Lab.
When this ITP is prepared and submitted
From pre-pour substrate inspection through curing to final moisture test and release to flooring trades.
Who receives or approves this ITP
Client/Consultant Representative for hold/witness point attendance and acceptance.
Inspection scope
Covers equipment checks, material verification, in-process testing, SR/level survey, thickness and strength checks, and moisture testing before finishes.
Typical hold, witness, and review points
Substrate readiness (H), initial flow (H/W), level pins (W), SR survey (W), pre-flooring moisture test (H).
Typical inspection records
ITR forms, delivery/CoC, flow logs, level/SR maps, test reports (strength/ISCR/pull-off), moisture reports, curing logs, NCR/CAR, acceptance certificates.
Important approval note
This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.
Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.
Inspection and test plan
| Activity | Inspection / Test | Acceptance Criteria | Responsibility | Record |
|---|---|---|---|---|
| Substrate and perimeter isolation inspection [HOLD POINT] | Visual and cleanliness check | Sound, clean substrate; isolation/joints installed; DPM/slip membrane continuous | SE/QA/Client | ITR; photos; checklist |
| UFH pressure test verification (if applicable) | Gauge reading/time log | Test pressure held without loss [Verify per project] | MEP/QA | UFH test certificate |
| Equipment and hose integrity check | Visual + low-pressure trial | No leaks; safety devices fitted | Supervisor/Pump Operator | Pump checklist |
| Level datum transfer and pin setting [WITNESS POINT] | Laser level spot checks | Pins within +5/−3 mm of design elevation | Survey/SE/Client | Level records |
| Initial flow/slump verification [HOLD/WITNESS] | Flow ring/slump per TDS | Within target range; no segregation/bleed | QA/QC & Client | Field test log |
| Ongoing flow/slump monitoring | Periodic tests each 20–30 min/20 m3 | Within target throughout pour | QA/QC | Field test log |
| Placement workmanship and segregation check | Visual checks during pour | Uniform matrix; no sand pockets or bleed | Supervisor/QA | Daily report; NCR if any |
| Level tolerance verification during pour | Spot levels at pins/grid | ±5 mm from datum [Verify] | SE/QA | Level sheet |
| Curing/protection inspection | Visual; timing log | Protection installed; drying regime per TDS | Supervisor/QA | Curing log |
| Surface Regularity (SR) survey [WITNESS POINT] | 2 m straightedge on 2 m grid | Meets SR1/SR2/SR3 as specified | QA/QC & Client | SR map/report |
| Thickness verification (spot cores/edges) | Measure cores/edges | +10/−5 mm or per spec | QA/QC | Thickness log |
| Strength/ISCR/pull-off (if specified) | Lab/field tests | Meets class and category per spec | QA/QC/Lab | Test reports |
| Moisture test prior to finishes [HOLD POINT] | In-situ RH or CM | Within finish manufacturer limit (e.g., ≤75% RH) | QA/QC & Client | Moisture test report |
| Final area acceptance/release to flooring | Document review and walkdown | All ITP stages closed; no defects | Client/Consultant | Area acceptance certificate |
This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.
Frequently asked questions
Related method statement
This Inspection and Test Plan is associated with the Method Statement: Pump-Applied Screed Works (Multi-Level Projects) method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.
View the Method Statement: Pump-Applied Screed Works (Multi-Level Projects) method statement →