Method Statement: Geothermal Production Wellhead Equipment and Piping Installation inspection and test plan example.

Inspection and Test Plan for Method Statement: Geothermal Production Wellhead Equipment and Piping Installation

AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.

Published 29 Sep 2026 Rev. 00 160 views 37 downloads
About this ITP: This ITP defines hold and witness points for geothermal wellhead and piping works, including material verification, welding, RT, pressure testing, and insulation.

More than a static template

Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.

  • AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
  • Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
  • Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
  • Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.

What you can customize

When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:

  • Inspection activity — Description of what is being inspected.
  • Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
  • Responsibility — Contractor, subcontractor, engineer, or client.
  • Frequency — How often the inspection occurs.
  • Acceptance criteria — Referenced standard or specification requirement.
  • Records — Forms, test reports, or checklists required as evidence.

Why this ITP is used

To ensure critical construction activities meet code, specification, and manufacturer requirements with documented verification.

Who uses this inspection and test plan

Contractor QA/QC, Site Engineers, NDE personnel, and Client/Engineer representatives.

When this ITP is prepared and submitted

From material receipt through final walkdown and turnover to operations.

Who receives or approves this ITP

Client/Engineer for review and approval.

Inspection scope

Covers materials verification, fit-up, welding parameters, NDE (VT/RT/PT/MT), PWHT, pressure testing, bolting, insulation/cladding, and final documentation.

Typical hold, witness, and review points

Master valve installation (H), RT interpretation (H), hydrotest (H), fit-up/welding parameters (W), insulation checks (W).

Typical inspection records

MTCs, PMI logs, fit-up and weld maps, NDE and PWHT reports, torque sheets, hydrotest packs, insulation reports, and MDR sign-off.

Important approval note

This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.

Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.

Inspection and test plan

Activity Inspection / Test Acceptance Criteria Responsibility Record
Material receipt and PMI Check MTCs, visual, PMI per plan Materials match spec/grade/size; PMI within alloy range; documentation complete QC Inspector / Client (W) Receiving report, PMI log, MTCs
Foundation/anchor verification Survey and level checks Elevation and bolt positions within tolerance Site Engineer / Client (W) Survey report
Master valve installation Face condition, gasket type, orientation API 6A compatibility; correct gasket; no damage QC Inspector / Client (H) Inspection checklist
Bolt torque/tension verification Torque/tension values and pattern Within specified bolt stress; uniform gap QC / Client (W) Torque record
Piping fit-up inspection Root gap, hi–lo, bevel angles Per WPS and ASME B31.3 tolerances Welding Inspector / Client (W) Fit-up report, weld map
Welding parameters and preheat Preheat/interpass, parameters Within WPS limits Welding Inspector Weld log
Intermediate VT/PT/MT VT 100%, PT/MT as specified No relevant indications beyond code QC / Client (W) NDE reports
PWHT (if applicable) Thermocouple placement; temp/time charts Within WPS/PQR limits Welding Engineer / Client (W) PWHT charts
Radiographic testing (RT) RT per ASME V or ISO 17636 ASME B31.3 acceptance criteria NDE Level II/III / Client (H) RT reports/images
Pressure test Hydrotest per B31.3 No leaks; hold and pressure criteria met Test Engineer / Client (H) Hydrotest pack
Insulation and cladding inspection Thickness, fit, overlap, weatherproofing Per spec; thickness +5/−0 mm; overlaps per method QC / Client (W) Insulation/Cladding reports
Final walkdown and documentation Punch closure, tags, nameplates All items closed; MDR complete QA/QC Manager / Client (W) Punch list, MDR sign-off

This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.

Frequently asked questions

Yes, if approved by the Client and compliant with acceptance criteria in ASME B31.3 or project specification.

The hydrotest pack includes marked P&IDs/isometrics indicating blinds, vents, test pressure, and gauge locations agreed at the pre-test meeting.

Related method statement

This Inspection and Test Plan is associated with the Method Statement: Geothermal Production Wellhead Equipment and Piping Installation method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.

View the Method Statement: Geothermal Production Wellhead Equipment and Piping Installation method statement →