Inspection and Test Plan for Method Statement: Integrated Testing of Generator, Automatic Transfer Switch (ATS), and Essential Loads
AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.
More than a static template
Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.
- AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
- Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
- Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
- Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.
What you can customize
When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:
- Inspection activity — Description of what is being inspected.
- Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
- Responsibility — Contractor, subcontractor, engineer, or client.
- Frequency — How often the inspection occurs.
- Acceptance criteria — Referenced standard or specification requirement.
- Records — Forms, test reports, or checklists required as evidence.
Why this ITP is used
To control and verify that generator and ATS systems meet functional and performance requirements under simulated mains failure and retransfer.
Who uses this inspection and test plan
Commissioning manager, test engineers, OEM reps, consultant/client witnesses, and HSE officers.
When this ITP is prepared and submitted
After installation and pre-commissioning checks are complete, before system handover and occupancy.
Who receives or approves this ITP
Engineer/Consultant and Client for witnessing and approval.
Inspection scope
Document reviews, site readiness, ATS/generator functional tests, load step and sustained run tests, alarms/shutdowns, retransfer, and documentation.
Typical hold, witness, and review points
Mains failure simulation, ATS transfer, 50%/100% step-loads, alarms/shutdowns, and final acceptance sign-off.
Typical inspection records
PTW, checklists, PQA data, timing logs, IR images, alarm matrix results, witness sign-off, final report.
Important approval note
This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.
Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.
Inspection and test plan
| Activity | Inspection / Test | Acceptance Criteria | Responsibility | Record |
|---|---|---|---|---|
| Pre-test documentation review | Check approvals, SLDs, protection settings, risk assessment, PTW, OEM attendance. | All documents approved; permits in place; instruments calibrated. | CxM / Engineer | Inspection checklist, approvals |
| Site readiness inspection | Area cordoned, signage, ventilation, extinguishers, spill kits, egress routes. | Safe work area confirmed. | CxM / HSE | HSE inspection form |
| Instrumentation setup verification | PQA connections, scaling, time sync; IR camera setup. | Correct and stable readings; event capture enabled. | Lead Test Engineer | PQA setup record |
| Generator pre-functional checks | Fluids, leaks, battery/charger, heaters, ventilation, earthing, breaker interlocks. | All within OEM limits; no leaks; interlocks working. | Generator OEM | Pre-functional checklist |
| ATS functional (no-load) | Control logic, sensing, permissives, indication/BMS points. | All functions correct; no spurious transfers. | ATS OEM | ATS function sheet |
| Mains failure simulation (HOLD) | Open upstream breaker or disable sensing per plan; confirm start signal. | Start signal issued per delay; no unsafe conditions. | Authorized Person / Witness | Switching record, event log |
| Generator start and stabilization | Crank time, speed ramp, voltage/frequency stabilization. | As per OEM/NFPA 110 Type; ready-to-load confirmed. | Generator OEM / Test Eng. | Startup log, PQA |
| ATS transfer to generator (WITNESS) | Transfer timing; open vs closed transition behavior; inrush/overlap. | Transfer within project limits; overlap ≤100 ms for closed-transition. | ATS OEM / Engineer | Timing record, PQA |
| Initial load pickup transients | Record frequency/voltage dip and recovery. | Dip/recovery within ISO 8528-5 class specified. [Verify] | Test Eng. | PQA plot |
| Step-load testing 25–100% (WITNESS at 50% and 100%) | Increase load in steps; hold each ≥10 min; monitor temps and PQ. | Stable operation; no trips; THD-V ≤15%; temps within OEM. | Generator OEM / Engineer | Step-load logs, IR report |
| Sustained full-load run | Run ≥60 min at ~100% kW; thermography. | No abnormal alarms; no hotspots above limits. | Generator OEM / Test Eng. | Runtime log, IR images |
| Load rejection test | Open generator breaker from high load; observe overspeed/voltage excursion. | Within OEM limits; safe recovery. | Authorized Person / OEM | PQA/event log |
| Alarms and shutdowns (WITNESS) | Trigger key alarms/trips incl. E-stop, overcrank, low oil, high temp, UV/UF. | Correct annunciation/action per matrix. | Test Eng. / Engineer | Alarm matrix record |
| Ancillary systems and BMS/SCADA I/O | Fuel transfer/day-tank, ventilation interlocks, fire alarm interfaces, monitoring points. | All I/O correct; interlocks operational. | MEP Leads / BMS Eng. | I/O test sheets |
| Return to normal supply (retransfer) | Restore utility; verify retransfer delay, cooldown, stop. | Per programmed logic; no parallel unless designed. | ATS OEM / Engineer | Timing log, PQA |
| Bypass-isolation ATS operation | Transfer to bypass and back; interlocks and indications. | No backfeed; safe operation. | ATS OEM / Test Eng. | Bypass checklist |
| Final documentation and sign-off (HOLD) | Review results, deviations, and corrective actions; capture signatures. | All acceptance met or approved deviations closed. | CxM / Engineer / Client | Commissioning report with signatures |
This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.
Frequently asked questions
Related method statement
This Inspection and Test Plan is associated with the Method Statement: Integrated Testing of Generator, Automatic Transfer Switch (ATS), and Essential Loads method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.
View the Method Statement: Integrated Testing of Generator, Automatic Transfer Switch (ATS), and Essential Loads method statement →