Method Statement: Installation of Ceiling-Suspended Fan Coil Units (FCUs) inspection and test plan example.

Inspection and Test Plan for Method Statement: Installation of Ceiling-Suspended Fan Coil Units (FCUs)

AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.

Published 11 Jul 2026 Rev. 00 287 views 240 downloads
About this ITP: This ITP defines inspections and tests for ceiling-suspended FCU installation, including anchor proof tests, hydrotests, condensate drain checks, insulation continuity, and a HOLD point before ceiling closure.

More than a static template

Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.

  • AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
  • Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
  • Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
  • Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.

What you can customize

When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:

  • Inspection activity — Description of what is being inspected.
  • Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
  • Responsibility — Contractor, subcontractor, engineer, or client.
  • Frequency — How often the inspection occurs.
  • Acceptance criteria — Referenced standard or specification requirement.
  • Records — Forms, test reports, or checklists required as evidence.

Why this ITP is used

To ensure each FCU installation meets code, standards, and project specifications, and to verify quality at defined checkpoints.

Who uses this inspection and test plan

Contractor’s QA/QC team, Site Supervisors, Consultant/Engineer, and Commissioning team.

When this ITP is prepared and submitted

From material receipt through final pre-ceiling inspection, prior to TAB/commissioning.

Who receives or approves this ITP

Consultant/Engineer for review and acceptance.

Inspection scope

Materials verification, anchorage and support installation, FCU placement and leveling, duct/CHW connections, hydrotesting, condensate system testing, insulation/vapor barrier inspection, documentation review.

Typical hold, witness, and review points

Anchor proof testing (W), Hydrostatic test (W/H as specified), Pre-ceiling closure inspection (HOLD).

Typical inspection records

MIRs, anchor logs and pull test reports, hydrotest certificates, drain test records, insulation checklists, pre-functional checklists, WIRs with photos.

Important approval note

This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.

Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.

Inspection and test plan

Activity Inspection / Test Acceptance Criteria Responsibility Record
Materials receipt and storage Check against MIR and submittals; damage/labels; certificates/calibrations Compliant make/model; no damage; certificates valid; storage as per manufacturer QA/QC Engineer MIR; delivery inspection report
Setting out and soffit scan Dimensional check; scanner report/photos Location within ±10 mm; no conflict with PT cables/utilities MEP Supervisor Layout checklist; scan record
Anchor installation and proof testing Visual embedment/edge distance; torque check; pull-out proof tests (sampling) Embedment/spacing per design; torque per TDS; proof load ≥ specified; no cone failure QA/QC Engineer Anchor log; pull test report; photos
Hanger rods and isolators Plumb check; thread engagement; isolator rating and deflection Rod within ±2°; engagement ≥1.5ר; isolator load within rating; lock nuts installed QA/QC Engineer Support inspection record
FCU lifting and fixing Rigging gear and SWL; torque of fixing nuts/bolts SWL ≥ 2× load; torque per spec; exclusion zone maintained Lifting Supervisor Lift checklist; torque record
Level/alignment of FCU Digital level readings at corners Level within ±1 mm/m or manufacturer; intentional fall 0.5–1.0% to drain if required QA/QC Engineer Leveling record; photos
Duct/flexible connections Visual seal and support; leakage class review UL 181 compliant; length and bend radius within limits; sealed to specified class QA/QC Engineer Duct checklist
CHW valve package installation Orientation; accessibility; actuator function Flow arrow correct; unions/strainer accessible; actuator strokes correctly QA/QC Engineer Valve package checklist
Hydrostatic pressure test (local) Pressurize to 1.5× operating or 10 bar [Verify]; hold ≥2 h; check for leaks/pressure drop No visible leaks; zero permissible pressure drop unless otherwise specified QA/QC Engineer Hydro test certificate; gauge calibration
Condensate drain and P-trap test Slope check; water fill test; verify trap height vs static pressure Slope ≥1%; leak-free; trap seal height adequate [Verify] QA/QC Engineer Drain test record; photos
Insulation and vapor barrier continuity Visual and touch check; seam sealing; box installation Thickness per spec; no condensation risk points; continuous seal QA/QC Engineer Insulation checklist; photos
Electrical/BMS pre-functional checks Continuity/IR; actuator stroke; float switch function Within electrical test limits; controls function as intended QA/QC Engineer Pre-functional checklist
HOLD POINT – Pre-ceiling closure inspection Verify all ITP items closed; visual of supports, insulation, labeling; photo records Consultant acceptance with no outstanding NCR/Snag Consultant/Engineer Signed WIR; inspection report; photo dossier

This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.

Frequently asked questions

Typically, anchor proof tests, hydrostatic tests, and the pre-ceiling HOLD inspection. Confirm with the project ITP matrix.

No. Complete and pass the hydrostatic test before insulating to avoid rework and concealed leaks.

Completed checklists, test certificates, calibrated instrument records, as-built photos, and closed punch list items.

Related method statement

This Inspection and Test Plan is associated with the Method Statement: Installation of Ceiling-Suspended Fan Coil Units (FCUs) method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.

View the Method Statement: Installation of Ceiling-Suspended Fan Coil Units (FCUs) method statement →