The checklist
Geometry
- Completed wall/segment location and orientation agree with the current approved drawings.
- Recorded wall height, thickness, line and plumbness meet approved tolerances.
- Openings, reveals, corners and connection zones are in their approved positions and dimensions.
Wall condition
- Printed layers show no unassessed tearing, gaps, voids, local collapse or excessive deformation.
- No visible cracking or suspected separation/delamination remains without a documented disposition.
- Restart interfaces and previously reported defect areas have been inspected and their status recorded.
Concealed work and interfaces
- Required reinforcement, anchors, grout/cavity infill and embed inspections are traceable to earlier release records.
- Service penetrations, sleeves and junctions to conventional construction match the approved details.
Curing and protection
- Specified curing and protection measures have been applied and documented for this wall/segment.
Sampling and records
- Sampling/specimen IDs, material batches and print logs are traceable to the inspected wall/segment.
- As-built survey and relevant inspection photographs are recorded against the correct wall/segment.
Disposition
- Open defects, repairs, NCRs or nonconforming measurements have recorded hold or approved technical disposition.
- Required completed-wall inspection notifications and stage releases have been recorded before subsequent work.
Preview the printable checklist
Preview page one below. Open the image or download the PDF for all pages.
At a glance
- For one completed printed wall or identified segment after printing.
- Confirm final geometry, visible condition, interfaces, curing and traceable evidence.
- Project-specific acceptance limits and release requirements always govern.