On site, we still get drafts—how do you enforce briefings so crews see the approved revision?
Construction Method Statements
Best practices and templates for construction method statements, RAMS documents, work sequencing, and safe execution planning.
6 articles on Method Statements
On site we always add a banksman step for excavators on slopes — what's your minimum swing-radius clearance for checks?
Include the banksman step in the RAMS and link it to the permit and temporary works for sloped excavations.
Make RAMS activity-specific and include explicit, measurable hold points linked to permits/WIRs. Practical caution: use clear acceptance criteria (compaction %, signed temporary works) so crews can't treat them as suggestions. How do you track sign-offs on site?
If waterproofing lap length is changed for a manufacturer’s reinforced joint, on site I insist on test data and a mock‑up before approval. Any quick field verification tips?
@Tatiana Ivanova I insist on a mock-up and 24h water ponding on the reinforced joint; do you require a sample width or multiple locations?
On-site: a "pour concrete as per spec" method statement is insufficient—confirm pre-pour inspections and the approved mix reference, or the first pour will likely be rejected.
🤔
On site we've had tender-stage method statements become contractual. Practical caution: record assumptions (equipment, sequence, approved mix) to avoid schedule/claim disputes.