Quollnet Cashflow

Quollnet project cashflow simulates real-life project work progress to generate cashflow projections. Enter project cost, advance payment, duration, retention, and more to forecast your cashflow.

Quollnet Cashflow
Quollnet Cashflow
English version

Quollnet Project Cash Flow

A better application was published by quollnet

CASHFLOWPOT

You can still use the old one, but it is very basic

Quollnet project cashflow uses mathematical distributions to simulate a real-life project work progress. Based on such work progress and the data given by the user, a cashflow projection will be generated. The data needed is as follows: Go To Cash Flow

  • Project Cost:

    The total selling cost of the project.

  • Advance Payment:

    A percentage of the Project Cost issued to the contractor prior to the start of work.

  • Duration:

    Time required to complete the project.

  • Retention:

    The percent deduction applied to each invoice issued by the contractor and repaid partially at the end of the project. The second part is repaid at the end of the defect liability period.

  • Liability period: DLP

    The period where the contractor remains liable for the quality of their work.

  • Algorithm:

    The algorithm to be used to simulate the project work progress.

  • Work in-excess of billing:

    The percentage of work performed per period that cannot be invoiced until next period

  • Resource prepayment:

    Percent of the project cost that shall be paid by the contractor over a period to hire subcontractors, book material, make mobilization, โ€ฆ

  • Duration of prepayment:

    The period required to higher subcontractors, finalize purchase contracts, complete the mobilization, purchase equipment โ€ฆ

  • Percent Profit:

    A percentage of the Project Cost retained by the contactor as profit.

  • Percent Subcontractor:

    The percentage of work that is expected to be performed by third party subcontractors.

  • Subcontracts retentions:

    The percent deduction applied to subcontractor invoices and released in two phases (1) after completion of the project, (2) after the defect liability period.

  • Per period interest rate:

    Percent interest rate charged against negative cashflow. The percentage is compounded per period. Example: If the period is in month, the percentage should be in month and the compounding period will be the same.

  • Elie Saad's photo
    Elie Saad
    Sep 15, 2024
    0
    125
    1.95k+
    2.11k+

    Related Checklists


    Work Breakdown Structure: 100% Coverage Creation Checklist
    โœ… 27 items
    Work breakdown structure is the foundation for organizing project scope into a clear, deliverable-based hierarchy. Also called a WBS, project breakdown, or scope decomposition, it helps teams transform a broad statement of work into manageable, measurable components. This checklist focuses on a deliverable-oriented, construction-ready approach applicable to any discipline and size, emphasizing the 100% rule, MECE thinking, and traceable work packages. By following these steps, youโ€™ll prevent common risks such as double-counting, scope gaps, ambiguous ownership, and uncontrolled rework. Youโ€™ll also accelerate estimating, scheduling, cost control, and progress measurement by building a robust WBS dictionary and coding structure aligned to your organization. Use this interactive page to tick items, add comments for clarifications, and attach evidence (screenshots, matrices, approvals). When complete, export as PDF/Excel and authenticate the output via QR for fast sharing and audits.
    Carpentry and Joinery Installation Inspection Checklist
    โœ… 15 items
    This Carpentry and Joinery Installation Inspection Checklist is designed to guide construction professionals in assessing the quality and accuracy of carpentry and joinery work on site. Whether you are a site manager, a quality assurance inspector, or a skilled tradesperson, this checklist provides a structured approach to ensuring installations meet industry standards and client specifications. It covers essential aspects such as materials, workmanship, safety, and compliance, helping you to identify and address potential issues before they escalate. Proper inspections not only enhance the durability and safety of the structures but also ensure customer satisfaction and project success.
    As-Built Surveys and Dimensional Checks Inspection Checklist
    โœ… 15 items
    As-built surveys and dimensional checks are critical processes in the construction industry, ensuring that the completed work aligns with the original design specifications. This inspection involves comparing the as-built conditions of a construction project with the planned drawings to identify any discrepancies. By conducting thorough dimensional checks, contractors can ensure quality control, compliance with standards, and avoid costly rework. This checklist is designed to facilitate a structured inspection process, allowing users to tick off items, leave comments, and export the completed report as a PDF or Excel file, secured with a QR code for authenticity.
    Steel Material & Fabrication Inspection Checklist | Ensure Safety
    โœ… 15 items
    Ensuring the quality and safety of steel materials and their fabrication is crucial before erection in any construction project. This comprehensive checklist provides detailed steps to assess the integrity, compliance, and suitability of steel components. By following this guide, inspectors and construction professionals can identify potential issues early, ensure adherence to industry standards, and ultimately contribute to the longevity and safety of the structure being erected.
    Final Plaster Finish Inspection Checklist
    โœ… 13 items
    Ensuring the quality of plaster work is crucial for the durability and aesthetics of any construction project. This checklist guides you through a comprehensive inspection of plaster finishes after curing, helping to identify imperfections and ensure compliance with industry standards. By following this checklist, inspectors and contractors can maintain high-quality standards and achieve a flawless finish that meets client expectations and safety regulations.

    Related Articles


    Master Construction Project Cashflow With Cashflowpot
    โณ 1 min read
    Master Construction Project Cashflow With Cashflowpot
    Learn how to optimize your construction project cash flow using CASHFLOWPOT in this easy-to-follow tutorial. From setting up new projects to adding activities and tracking cash flow, this guide will help you efficiently manage your finances. Plus, learn how to export your cash flow data to Excel for in-depth analysis. Ideal for both beginners and experienced construction managers.
    How To Create a Project Cash Flow For Contractors
    โณ 6 min read
    Learn How To Create a Comprehensive Cash Flow For Construction Projects. Introducing Cashflowpot
    Learn how to create a comprehensive cash flow for construction projects, including key contract conditions, subcontractor retention, work in excess of billing (WIEB), advance payments, and indirect costs. This step-by-step guide helps contractors manage project cash flows efficiently.
    How To Create Your First Snag
    โณ 1 min read
    How To Create Your First Sang In 4 Easy Steps
    This article provides a step-by-step guide on creating a new snag using Snag Here, a web and mobile app for managing snags (construction defects) in projects. It covers logging in, creating projects, creating snag lists, selecting companies, and finally creating new snags with the ability to add images.
    Construction Cashflow Prediction
    โณ 7 min read
    Construction Project Cash Flow Prediction
    Learn how to accurately predict construction project cash flows using mathematical models such as polynomial and exponential curves. Discover essential adjustments, including advance payments, retention deductions, payment delays, and work-in-progress billing, to align predicted work with real cash outflows.
    Advance Payment Construction Contracts
    โณ 5 min read
    Advance Payment In Construction Contracts: Legal Provisions, Recovery Formulas, And Key Insights
    Explore the essentials of advance payments in construction contracts, including their purpose, legal provisions, and applications in FIDIC, NEC, and JCT frameworks. This article covers recovery formulas, mobilization payments, price adjustment clauses, and strategies for managing contractor cash flow and project risks. A valuable guide for professionals navigating construction finance and legal contracts.