User avatar G
Guest

Quoll LDA Terms Of Service

quoll logo 3d 512

Quoll LDA Terms of Service

Welcome to Quoll LDA! By accessing or using our applications, you agree to comply with and be bound by the following terms and conditions of use. Please read these terms carefully before using our applications.

1. Acceptance of Terms

By accessing or using our applications, you agree to be bound by these Terms of Service and all applicable laws and regulations. If you disagree with any part of these terms, you may not access or use our applications.

2. Use License

a. Permission is granted to temporarily download one copy of the materials (information or software) from our applications for personal, non-commercial transitory viewing only. This is the grant of a license, not a transfer of title, and under this license you may not:

  • i. Modify or copy the materials;
  • ii. Use the materials for any commercial purpose, or for any public display (commercial or non-commercial);
  • iii. Attempt to decompile or reverse engineer any software contained within our applications;
  • iv. Remove any copyright or other proprietary notations from the materials; or
  • v. Transfer the materials to another person or "mirror" the materials on any other server.

b. This license shall automatically terminate if you violate any of these restrictions and may be terminated by Quoll LDA at any time. Upon terminating your viewing of these materials or upon the termination of this license, you must destroy any downloaded materials in your possession whether in electronic or printed format.

3. Disclaimer

The materials within our applications are provided on an 'as is' basis. Quoll LDA makes no warranties, expressed or implied, and hereby disclaims and negates all other warranties including, without limitation, implied warranties or conditions of merchantability, fitness for a particular purpose, or non-infringement of intellectual property or other violation of rights.

4. Limitations

In no event shall Quoll LDA or its suppliers be liable for any damages (including, without limitation, damages for loss of data or profit, or due to business interruption) arising out of the use or inability to use our applications, even if Quoll LDA or a Quoll LDA authorized representative has been notified orally or in writing of the possibility of such damage.

5. Revisions and Errata

The materials appearing in our applications could include technical, typographical, or photographic errors. Quoll LDA does not warrant that any of the materials are accurate, complete, or current. Quoll LDA may make changes to the materials contained in its applications at any time without notice.

6. Governing Law

These terms and conditions are governed by and construed in accordance with the laws of [Your Jurisdiction] and you irrevocably submit to the exclusive jurisdiction of the courts in that State or location.

7. Modifications to Terms of Service

Quoll LDA may revise these terms of service for its applications at any time without notice. By using our applications you are agreeing to be bound by the then current version of these Terms of Service.

8. Contact Us

If you have any questions about these Terms of Service, please contact us at: support@quollnet.com .

Quollnet Editorial Team's photo
Quollnet Editorial Team
@Quollnet Team
Mar 26, 2022
0
75
1.40k+
670

Related Checklists


Marine Concrete Placement and Curing Inspection Checklist
✅ 14 items
Inspecting marine concrete placement and curing is crucial for ensuring the longevity and safety of marine structures exposed to harsh environments. This process involves assessing the quality of concrete materials, monitoring placement techniques, and verifying proper curing methods. Our comprehensive checklist helps you cover all critical aspects, from pre-placement preparations to post-curing evaluations. By using this checklist, inspectors can identify potential issues before they escalate, ensuring compliance with industry standards, prolonging the structure's lifespan, and reducing maintenance costs. Our interactive features allow users to tick off tasks, add comments, and export reports, providing a streamlined inspection process.
Security System Functional Testing & Acceptance Checklist
✅ 18 items
Security system functional testing and acceptance is a crucial phase in the deployment of any security infrastructure. This process involves verifying that all components of the security system are working as intended, including alarms, surveillance equipment, and access controls. The checklist is designed to ensure that each element meets predefined standards and specifications. Proper functional testing and acceptance help mitigate risks of system failure, ensuring security protocols are robust and reliable. With our interactive checklist, users can tick off each task, add comments, and export the completed report as a PDF or Excel file, complete with a QR code for authenticity.
Pavement Expansion Joint & Sealant Inspection Checklist
✅ 12 items
Inspecting expansion joints and sealant for pavements is crucial for maintaining the integrity and longevity of paved surfaces. This process involves assessing the joints that accommodate thermal expansion and contraction, as well as the sealants that protect these joints from moisture and debris. Proper inspection can prevent costly repairs, ensure safety, and extend the lifespan of pavements. This checklist guides you through the essential steps for a thorough inspection, from preparatory work to final documentation. Use our interactive features to tick off tasks, leave comments, and generate comprehensive reports with unique QR codes for authenticity.
Verify Subcontractor Prequalification & Quality Agreements
✅ 14 items
Ensuring subcontractor prequalification and quality agreements are thoroughly verified is essential to maintaining high standards in any project. This checklist guides project managers and quality assurance teams through the critical steps necessary to confirm that subcontractors meet all prequalification criteria and adhere to quality agreements. By completing these tasks, you minimize risks, ensure compliance with standards, and guarantee the integrity of the work delivered. Utilize our interactive checklist to track progress, leave comments, and export reports for documentation and stakeholder communication.
Comprehensive Structural Steel Welding and Bolting Inspection
✅ 14 items
Structural steel welding and bolting inspections are critical in ensuring the integrity and safety of steel structures. This process involves a thorough examination of welds and bolts, either visually or using Non-Destructive Testing (NDT) methods if required. The inspection aims to identify any defects or issues that might compromise the structural stability. This checklist is essential for quality assurance, helping prevent costly repairs and ensuring compliance with safety standards. Users can interact with this checklist by ticking items, adding comments, and exporting the completed report as a PDF or Excel document, complete with a unique QR code for authentication.

Related Articles


Safety Construction Safety Checklists
⏳ 5 min read
Safety In Construction: The Role Of Periodic Safety Checklists
Discover how implementing daily, weekly, and monthly safety checklists can improve compliance and reduce accidents on construction sites.
Quollnet Cashflow
⏳ 2 min read
How To Use Quollnet To Predict Construction Project Cashflow
Quollnet project cashflow simulates real-life project work progress to generate cashflow projections. Enter project cost, advance payment, duration, retention, and more to forecast your cashflow.
Daily Construction Delay Report
⏳ 1 min read
Daily Construction Delay Report | Free Pdf, Excel Sample Download
Download a free Daily Site Delay Report sample in PDF format. Document daily delays, causes, site conditions, and corrective actions with this clear, ready-to-use form.
Request For Quotation Rfq Form Template
⏳ 3 min read
Rfq Form Template For Procurement | Free Download (pdf, Excel, Word)
Download a free, customizable Request for Quotation (RFQ) form template. Ideal for small tenders; available in PDF, Excel, Word formats to streamline procurement.
Privacy Policy
⏳ 2 min read
Quoll Lda Privacy Policy
description" content="Privacy policy for applications developed by Quoll LDA, particularly focusing on construction management applications by QuollNet, aimed at decreasing construction risks and improving project monitoring.