G
Guest

Construction Tender Progress Log Template

Download our free Construction Tender Progress Log template from Quollnet to track every bid phase in Excel, PDF, or IMAGE. Automate tender management today.

Construction Tender Progress Log Template
Construction Tender Progress Log Template
English version

Free Construction Tender Progress Log Template – Excel, PDF & Image Download

What is a Construction Tender Progress Log?

A Construction Tender Progress Log (aka tender tracking template or bid tracker) is a simple tool that helps contractors manage and monitor every phase of their bid pipeline—from Invitation to Bid through estimation, financial checks, technical reviews, and final submission.

construction tender progress


Featured Snippet–Ready Summary

  • Tool Name: Construction Tender Progress Log

  • Purpose: Tracks tender lifecycle across Estimation, Financial & Technical streams

  • Formats: Excel (XLSX), PDF, PNG

  • Benefits: Real-time visibility, improved accountability, reduced missed deadlines


Why You Need This Log

  • ✅ Real-Time Visibility: See the status of QS, WBS, RFQ, BOQ, bond issuance, cashflow & more.

  • ✅ Parallel Tracking: Monitor document reviews, method statements, HSE plans & risk registers at a glance.

  • ✅ Deadline Management: Color-code overdue (red) and upcoming (amber) tasks.

  • ✅ Accountability: Clear “In Progress,” “Completed,” or “Not Started” states for each sub-task.


construction tender progress log Construction Tender Progress Log

Free Download

Choose the format that fits your workflow:


Call to Action

Streamline your bid process today—download the Construction Tender Progress Log and take control of your tender tracking. Share your feedback or request customizations in the comments below!

Elie Saad's photo
Elie Saad
Jun 25, 2025
5
73
59.42k+
8.07k+

Related Checklists


Construction Tender Document Review Checklist
✅ 14 items
The construction tender document review is a critical process undertaken by contractors upon receiving a tender invitation. This phase involves a thorough examination of all documents associated with the tender to determine the feasibility and desirability of bidding on the project. The review includes evaluating project specifications, timelines, costs, and legal implications. This checklist ensures that contractors meticulously assess each component to make an informed bid decision, minimizing risks and enhancing the quality of the bid. Users can interact with the checklist by ticking off items, adding comments, and exporting the results as PDF or Excel, complete with a QR code for authenticity.
Shell and Core Phase Checklist for Luxury Construction
✅ 10 items
The Shell and Core Phase Checklist is essential for ensuring high luxury standards in the Amanruya Bodrum Hotel and Residences project. This checklist supports QA/QC managers by providing a detailed framework to assess the quality and compliance of shell and core construction elements. Properly executing this checklist minimizes risks related to structural integrity and ensures adherence to project specifications. Engage with our interactive checklist: tick off items, add comments, or export it to PDF/Excel for your records, secured by QR code.
Locate Underground Utilities Checklist – GPR, Marking
✅ 22 items
Locate underground utilities is the first safeguard against costly strikes, delays, and service outages. This checklist guides teams through utility detection using records review, electromagnetic locating, and ground-penetrating radar, then marking services, establishing stand-offs, and implementing protection. It focuses on avoidance and verification only—no new utility construction is included. You will plan from as-builts and GIS, validate with GPR and EM methods, reconcile conflicts, and confirm critical depths with safe potholing or vacuum excavation. The workflow aligns with subsurface utility engineering practices to improve accuracy and reduce excavation risk. Acceptance cues, tolerances, and photo evidence are specified to ensure consistent results and defensible documentation across shifts and contractors. Use this interactive tool on live projects to brief crews, control plant movement, and maintain exclusion zones as conditions change. Start in interactive mode to tick items, add comments, and export as PDF/Excel with a QR-secured record.
Lifting Anchors & Embedded Plates Inspection Checklist
✅ 15 items
The inspection of lifting anchors and embedded plates is a critical process in the façade installation phase of construction. These components play a crucial role in ensuring the structural integrity and safety of the building façade. Our checklist provides a detailed guide to inspect the quality and installation standards of these anchors and plates. It covers material verification, alignment checks, and safety compliance, ensuring that no critical aspect is overlooked. Utilizing this checklist helps prevent potential structural failures, enhances safety, and ensures compliance with construction standards. This interactive checklist allows users to tick items, leave comments, and export reports as PDF or Excel, complete with a QR code for authenticity.
Pre-condition surveys of adjacent properties checklist
✅ 21 items
Pre-condition surveys of adjacent properties provide a defensible record of visible conditions before construction begins. This baseline property survey, also called a preconstruction condition survey or adjacent building documentation, focuses on photos, crack width measurements, and clear notes that help benchmark potential damage claims. The scope purposefully excludes structural assessment, calculations, and engineering opinions; it captures what is observable and measurable with simple tools. By following a consistent method—wide-to-close photography with a scale, crack comparators in millimetres, clear room-by-room indexing, and consent-backed access—you reduce disputes, protect relationships, and streamline insurance discussions. You will also implement disciplined data control: unique IDs, dated filenames, mapped locations, and digitally signed acknowledgments. Use this interactive checklist to plan access, document exteriors and permitted interiors, install non-invasive tell‑tale crack gauges where allowed, and compile a clean, shareable record. Tick each step, add comments where needed, and export your commentable report as PDF/Excel with a QR-secured link.

Related Articles


Construction Delay Log
⏳ 2 min read
Construction Delay Log Template | Excel, Pdf & Word Download
Download a free Construction Delay Log Template in Excel, PDF, and Word formats. Log delays by activity, cause, and EOT ID. Track impacts and submit claims with ease.
Construction Tender Register Bid Tracker Template
⏳ 2 min read
Construction Tender Register & Bid Tracker Template – Free Excel, Pdf & Png
Download our free Construction Tender Register & Bid Tracker Template in Excel, PDF & PNG to streamline bids and track ITBs, decisions & outcomes with KPIs.
Tender Bid Bond Guide
⏳ 3 min read
Tender Bid Bond Guide: Definitions, Best Practices & Free Templates
Discover the ultimate tender bid bond guide—covering requirements, best practices, and free templates to streamline construction bids. Download now!
Ncr Log Template E46
⏳ 2 min read
Ncr Log Template (register & Ncr Tracker) – Excel/pdf Download
Download an NCR log template (NCR register) to track non-conformance reports by ID, date, status, location, references, actions, and closure. Includes an empty template and a filled example in Excel and PDF.
Construction Tender Preparation Guide
⏳ 4 min read
Construction Tender Preparation Guide | Step-by-step Bidding Process
Learn the complete construction tender preparation process—from receiving invitations to bid through strategic team mobilization, analysis, and winning proposals.