Request for Inspection Form for Contractors — Excel, Word and PDF
A Request for Inspection form is used by a contractor or subcontractor to ask the project consultant or authorized inspector to examine completed construction work. Download the free Excel, Word or PDF templates below, then enter the project details, work location, inspection scope and supporting document references before submission.
Download the Request for Inspection Form
Choose the format that suits your project. The editable templates can be adapted to the project's inspection procedures and document-control requirements.
- Download Request for Inspection Form — Excel Template
- Download Request for Inspection Form — Word Template
- Download Request for Inspection Form — PDF

What Is Included in the Inspection Request Form?
- Project information: project name, location, contractor and relevant parties.
- Inspection identification: request number, submission date and the work or trade to be inspected.
- Work description and location: the completed activity, building, floor, zone or grid reference so the inspector can find it.
- Contractor's certification: confirmation that the submitted work has been checked against the applicable approved drawings, specifications and inspection requirements.
- Subcontractor information: details of the responsible subcontractor when applicable.
- Supporting documents: references to approved drawings, checklists, test records or photographs, as applicable.
- Consultant's inspection record: findings, comments and the applicable project-defined inspection outcome.
How to Fill Out a Request for Inspection Form
- Enter the project details. Identify the project and the contractor submitting the request.
- Describe the work. State precisely what is ready for inspection, including its location, activity and relevant drawing reference.
- Complete the contractor check. Verify that the work is ready and record any required internal QA/QC check before requesting an external inspection.
- Attach supporting evidence. Include inspection checklists, test results, drawings or photos where required by the approved Inspection and Test Plan (ITP).
- Submit the request. Send it using the project's agreed communication channel and inspection-notice procedure.
- Record the response. Keep the inspector's comments and status with the request; correct and request reinspection where necessary.
Example: Requesting an Inspection of Reinforcement
For a concrete slab reinforcement inspection, the contractor would identify the slab or zone, specify that reinforcement is ready for inspection, cite the approved structural drawing and relevant ITP item, and attach the completed pre-inspection checklist. The consultant records findings and the project's applicable inspection outcome in the form. This is an illustrative example; always use the fields and acceptance requirements specified for the actual project.
Why Use a Standard Inspection Request Template?
A consistent form helps identify the work, document contractor readiness, communicate the inspection scope and preserve a traceable response. These downloadable templates provide a starting point; they do not replace the project's approved forms, specifications or inspection procedures.
For the wider submission and review process, see our Work Inspection Request (WIR) guide. A request for inspection may be abbreviated RFI on some projects; do not confuse it with a Request for Information, which is a different construction record.