The checklist
Container Check
- Ensure the first aid kit container is undamaged and securely closes.
Label Inspection
- Verify that the first aid kit label is visible and legible.
Bandages
- Check the quantity and expiration dates of adhesive bandages.
Sterile Wipes
- Ensure that antiseptic wipes are available and not expired.
Gauze Pads
- Verify stock and check expiration of sterile gauze pads.
Adhesive Tape
- Confirm that adhesive tape is available and in good condition.
Scissors
- Check that scissors are present and functional.
Tweezers
- Ensure tweezers are included and in good working order.
CPR Mask
- Verify there is a CPR face mask or shield available.
Gloves
- Check supply of non-latex, disposable gloves.
Emergency Blanket
- Ensure an emergency thermal blanket is provided.
Cold Pack
- Check for presence and integrity of an instant cold pack.
Burn Cream
- Verify that burn cream or treatment is available and not expired.
Eye Wash
- Ensure there is an eye wash solution and check expiration date.
First Aid Manual
- Confirm a first aid instruction manual is present.
Pain Relievers
- Check availability and expiration of pain relief medication.
Inventory List
- Update the first aid kit inventory list with current supplies.
Preview the printable checklist
Preview page one below. Open the image or download the PDF for all pages.