Inspect curtain wall transom installation with an interactive checklist. Verify level, connection quality, and evidence. Fully commentable, with export as PDF/Excel and QR security.
Interactive checklist for formwork removal and temporary works dismantling, with tick, comment, and export as PDF/Excel features.
Inspect cavity barriers at façade zones before concealment with an interactive checklist. Commentable steps, measurable evidence, and export as PDF/Excel with QR-secured reports.
Ensure quality and compliance with our detailed door and window frame installation inspection checklist. Prevent issues and enhance safety.
Ensure your concrete projects meet quality standards with our detailed inspection checklist. Improve safety and structural integrity today.
Periodic Service (250h/500h/1000h) (All Excavators) interactive checklist: commentable steps, measurable tolerances, and evidence. Export as PDF/Excel with QR-secured records for audit-ready maintenance.
Interactive checklist for inspecting soil compaction and geotechnical tests before foundation works. Tick, comment, and export as PDF/Excel.
Test dynamic façade actuator synchronization across linked panels with an interactive checklist that is commentable and can export as PDF/Excel for verified safety, timing, and performance.
Retaining wall stem reinforcement (vertical) inspection via an interactive checklist; commentable and export as PDF/Excel for spacing, cover, laps, openings.
Basement/Tank Flood Testing made simple with an interactive checklist that’s commentable and easy to export as PDF/Excel; verify isolation, fill/hold, leak repairs, and sign-off.