Inspect circular spiral duct seam engagement, surface damage, and specified sealing. Document access limits, defects, repairs, and unverified areas.
Inspect duct branch take-off location, fitting geometry, secure attachment, and joint sealing using approved project details and manufacturer instructions.
Inspect rectangular duct transitions for dimensions, offsets, visible joint integrity, and clear airflow passage against approved project requirements.
Inspect rectangular duct radius elbow geometry, internal contours, seams, and airflow clearance against approved fabrication details and specified tolerances.
How to inspect rectangular duct square-elbow turning vanes: verify vane count, curvature, spacing, secure attachment, alignment, and that no loose edges or debris are present.
Inspect rectangular duct transverse joint sealing before insulation: verify alignment, gaskets, and continuous exterior seals at seams, corners, and penetrations.
3D Concrete Printing During-Print Quality Inspection Checklist for one 3D concrete printing site visit, using approved project tolerances and documented inspection releases.
Inspect rectangular duct longitudinal seams before insulation: verify seam closure, continuous sealant coverage, adhesion, clean workmanship, and complete documentation.
3D Printed Concrete Reinforcement and Embedded Services Inspection Checklist for one 3D concrete printing site visit, using approved project tolerances and documented inspection releases.
3D Printed Concrete Completed Wall Inspection Checklist for one 3D concrete printing site visit, using approved project tolerances and documented inspection releases.