Inspect circular duct band hangers for strap dimensions, fastening, support spacing and local deformation using approved details and manufacturer instructions.
Inspect rectangular duct hanger rods, trapeze supports, spacing, and anchorage against approved details, with clear records and deficiency closeout.
Inspect flat-oval duct flange geometry, gasket continuity, fastening, and alignment using approved details, pre-closure evidence, and documented closeout.
Inspect circular duct elbows and tees for correct orientation, nearby supports, and leak-resistant joints, with checks before concealment and closeout.
Inspect circular duct couplings and slip joints for engagement, fasteners, sealing, and alignment using project requirements and joint-specific evidence.
Inspect circular spiral duct seam engagement, surface damage, and specified sealing. Document access limits, defects, repairs, and unverified areas.
Inspect duct branch take-off location, fitting geometry, secure attachment, and joint sealing using approved project details and manufacturer instructions.
Inspect rectangular duct transitions for dimensions, offsets, visible joint integrity, and clear airflow passage against approved project requirements.
Inspect rectangular duct radius elbow geometry, internal contours, seams, and airflow clearance against approved fabrication details and specified tolerances.
How to inspect rectangular duct square-elbow turning vanes: verify vane count, curvature, spacing, secure attachment, alignment, and that no loose edges or debris are present.