Ensuring the proper installation and alignment of steel structures is crucial for safety and structural integrity. This checklist provides a comprehen...
Ensure safety and compliance with our comprehensive steel erection and alignment inspection checklist. Perfect for engineers and site inspectors.

Leila Haddad's photo
TransitLeila
1
2813
4178
71
198
Set up crack gauges or tell-tales on adjacent structures to monitor crack movement safely and objectively during nearby construction activities. This ...
Set up crack gauges or tell-tales on adjacent structures - interactive checklist, commentable, export as PDF/Excel. Baseline readings, protection, and frequency.

Santiago Torres's photo
Santiago Torres
1325
3192
3
14
Review façade design criteria and performance requirements before detailed design is the most effective way to lock in façade performance while contro...
Review façade design criteria and performance requirements before detailed design with an interactive checklist that’s commentable and can export as PDF/Excel, aligning targets and tests early.

Jack yung's photo
Jack Yung
908
72
Masonry inspection, also known as blockwork inspection, involves the detailed examination of brick, block, or stone structures to ensure their constru...
Use our interactive masonry inspection checklist with comment and export features to ensure construction quality and compliance.

Elie Saad's photo
Elie Saad
1898
3831
34
73
Inspect façade vapor barrier continuity and sealed overlaps is a focused quality control task that confirms the vapor control layer is continuous, cor...
Inspect façade vapor barrier continuity and sealed overlaps with an interactive checklist, fully commentable and export as PDF/Excel for compliant façades with photo evidence, measurements, and adhesion results.

William Anderson's photo
William Anderson
943
82
Inspecting signage and identification installations ensures that all signs are properly mounted, visible, and compliant with regulations. This process...
Interactive checklist for inspecting signage installation. Commentable, exportable as PDF/Excel, ensures compliance & safety.

Giovanni Rossi's photo
Giovanni Rossi
6818
3968
36
47
Material submittals and approvals are critical processes in construction management that ensure the materials used meet project specifications and sta...
Interactive checklist for verifying material submittals and approvals. Tick, comment, export as PDF/Excel to ensure compliance and avoid delays.

Leon Dubois's photo
LabChefLeon
1763
3900
23
93
Inspecting site fencing, hoardings, and signage is crucial for ensuring safety, compliance, and effective project management on construction sites. Th...
Interactive checklist for site fencing, hoardings, and signage inspection. Commentable and exportable as PDF/Excel with QR code security.

Isla McGregor's photo
SafetyIsla
1
5901
3531
17
56
Test façade mock-up for water penetration under dynamic pressure is a critical building envelope quality assurance procedure. Also called dynamic wate...
Test façade mock-up for water penetration under dynamic pressure with an interactive checklist. Fully commentable and export as PDF/Excel, capturing calibrated data and sign-offs.

Nina Kovacis's photo
Nina Kovacis
913
77
The site survey and layout benchmark inspection is a crucial preparatory phase in construction projects. It involves verifying the accuracy of the sit...
Interactive checklist for site survey and layout inspection. Comment, tick, and export as PDF/Excel, secured with QR code.

Tariq Malik's photo
MetroMasterTariq
1
2020
3443
37
89