G
Guest

Inspect GRC or GFRC Panel Installation and Joint Alignment image
G
Inspect GRC or GFRC Panel Installation and Joint Alignment
construction quality assurance +1

Inspect GRC or GFRC panel installation and joint alignment with our interactive checklist, commentable and export as PDF/Excel to verify tolerances and approvals.

Test façade sealant cohesion and cure – final acceptance image
F
Test façade sealant cohesion and cure – final acceptance
construction quality assurance +1

Test façade sealant cohesion and cure before final acceptance with an interactive checklist. Commentable steps, calibrated evidence, and results you can export as PDF/Excel.

Review façade vapor control layer & condensation risk image
F
Review façade vapor control layer & condensation risk
construction quality assurance +1

Review façade vapor control layer and condensation risk at envelope transitions with an interactive checklist, commentable, and able to export as PDF/Excel.

Survey and mark pile cut-off levels: field checklist image
P
Survey and mark pile cut-off levels: field checklist
construction quality assurance +2

Survey and mark pile cut-off levels using an interactive checklist with precise tolerances; commentable steps, evidence photos, and easy export as PDF/Excel for approvals.

Review façade system selection against project geometry and exposure conditions image
F
Review façade system selection against project geometry and exposure conditions
construction quality assurance +1

Review façade system selection against project geometry and exposure conditions using an interactive checklist that is commentable and can export as PDF/Excel for cladding decisions.

Test façade closeout defects after remedial works, retesting image
F
Test façade closeout defects after remedial works, retesting
construction quality assurance +1

Test façade closeout defects after remedial works and retesting using an interactive checklist that’s commentable and export as PDF/Excel, with clear evidence, tolerances, and sign‑off.

Test façade cleaning-access provisions and safe-reach zones image
F
Test façade cleaning-access provisions and safe-reach zones
safety maintenance +2

Test façade cleaning-access provisions and safe-reach zones with an interactive checklist that’s commentable and export as PDF/Excel, ensuring full, safe reach coverage for window cleaning.

Test façade mock-up for water penetration, dynamic pressure image
F
Test façade mock-up for water penetration, dynamic pressure
construction quality assurance +1

Test façade mock-up for water penetration under dynamic pressure with an interactive checklist. Fully commentable and export as PDF/Excel, capturing calibrated data and sign-offs.

Lightning Protection System Installation Inspection image
L
Lightning Protection System Installation Inspection
safety maintenance +1

Interactive checklist for inspecting lightning protection systems. Comment, export as PDF/Excel, and ensure safety with QR code authentication.

Review façade glass thickness and pane build-up checklist image
F
Review façade glass thickness and pane build-up checklist
construction quality assurance +1

Review façade glass thickness and pane build-up against loading criteria using an interactive checklist. Commentable, traceable, and export as PDF/Excel.