Excavate trenches with shoring/benching using an interactive checklist—commentable and export as PDF/Excel—to verify support class, access, water control, and backfill windows for safe, compliant excavation.
Drill bored piles ≤ 600 mm inspection with interactive checklist, commentable records, and export as PDF/Excel. Verify verticality, base cleanliness, groundwater control, and diameter pre-placement.
Interactive checklist for inspecting food service equipment and sanitation, with features to add comments and export as PDF/Excel.
Approve Select Backfill Sources and Moisture interactive checklist for inspectors: commentable workflow to verify gradation, moisture conditioning, and contamination control, with evidence capture and export as PDF/Excel.
Approve pile concrete mixes with an interactive checklist that’s commentable and export as PDF/Excel. Validate slump/flow, AWA/SCC, durability classes, and batching controls pre-production.
Inspect horizontal sunshade alignment and projection tolerance with an interactive checklist that’s commentable and can export as PDF/Excel. Capture measurements, photos, and sign-offs.
Pile Casing Inspection Checklist for temporary/permanent casings. This interactive checklist is commentable and export as PDF/Excel, focusing on straightness, joints/welds, alignment, and extraction planning.
Install ground anchors with this interactive checklist: verify lengths, corrosion protection, and grouting. Commentable and export as PDF/Excel with QR sign-off.
Interactive checklist for inspecting specialized flooring like epoxy and industrial coatings. Tick, comment, and export as PDF/Excel with QR code.
Interactive checklist for inspecting lab gas and vacuum systems. Tick, comment, and export as PDF/Excel with QR code for authenticity.