Apply vertical liquid-applied membranes with an interactive checklist. Verify DFT, curing, pinholes, adhesion. Fully commentable and export as PDF/Excel with QR-secured records.
Maintain piling records with an interactive checklist—commentable and export as PDF/Excel. Log depths, spoil, refusals, tremie data, volumes, and timestamps for bored piles.
Review façade bracket design and adjustment allowances before issue using an interactive checklist that is commentable and can export as PDF/Excel, verifying loads, fixings, and tolerances before release.
Drive steel H-piles with an interactive checklist for shoes, splices, penetration, blow counts, and alignment; commentable and export as PDF/Excel for compliance.
Set up temporary drainage swales and sumps with an interactive checklist, commentable and export as PDF/Excel, verifying sizing, slopes, outfalls, and siltation.
Inspect curtain wall internal air barrier continuity at slab edge with an interactive checklist, commentable, and export as PDF/Excel for traceable transitions.
Inspect dynamic façade safety stops and fail-safe positions with an interactive checklist that is commentable and export as PDF/Excel for compliant, documented fail-safe behavior.
Inspect curtain wall interface with steel support framing using an interactive checklist. Commentable steps capture evidence and tolerances, then export as PDF/Excel for QR-authenticated sign-off.
Low-strain integrity testing (PIT/SE) checklist for setup, signal quality, defect screening, and acceptance—interactive, commentable, and export as PDF/Excel.
Validate instrumentation data acquisition with an interactive checklist; commentable controls and options to export as PDF/Excel for compliant audits and reporting.