Drive precast/spun piles using our interactive checklist. Monitor hammer energy, blow counts, splices, and damage. Fully commentable and export as PDF/Excel for compliant records.
Inspect basement wall formwork and ties (vertical) with an interactive checklist that’s commentable and export as PDF/Excel. Verify plumb, dimensions, ties, cones, and release agents.
Install vertical bentonite sheets using this interactive checklist—commentable and export as PDF/Excel—to verify overlaps, fixings, penetrations, and protection on vertical walls only.
Inspect fixed louver blade installation for spacing and orientation with interactive, commentable checklists exporting as PDF/Excel to ensure pitch, angle, and alignment.
Test dynamic façade actuator synchronization across linked panels with an interactive checklist that is commentable and can export as PDF/Excel for verified safety, timing, and performance.
Periodic Service (250h/500h/1000h) (All Excavators) interactive checklist: commentable steps, measurable tolerances, and evidence. Export as PDF/Excel with QR-secured records for audit-ready maintenance.
Inspect curtain wall insulation continuity behind spandrel areas with an interactive checklist, commentable and exportable as PDF/Excel, for thermal continuity.
Bi-directional O-Cell test interactive checklist for foundation teams; commentable and export as PDF/Excel. Verify jacks, gauges, bi-directional loads, and interpretation with clear evidence prompts.
Inspect dynamic façade sensors for sun, wind, and rain response with an interactive checklist that is commentable and can export as PDF/Excel for traceable commissioning.
Review façade anchor design and substrate fixing assumptions before release with interactive checklist, commentable, and export as PDF/Excel. Ensure QA traceability.