QMix Designer
Preliminary concrete mix design calculator for estimating cement, water, sand, coarse aggregate, water-cement ratio, slump, batch quantities, moisture correction, and ACI-style / Eurocode EN 206 durability checks.
QMix Designer
Estimate preliminary concrete proportions, batch quantities, water-cement ratio, moisture correction, and ACI-style / Eurocode EN 206 durability boundaries before final lab approval.
Mix design inputs
Use project specification values when available. Defaults are preliminary estimating assumptions.
Ready to verify
Enter your site conditions and calculate a preliminary concrete batch estimate.
Absolute volume
1.00 unit yieldYield recipe card
Per 1.00 m³| Material / note | Per unit | Batch |
|---|---|---|
| Calculate to display the material schedule. | ||
QA/QC verification notes
Preliminary checksReady to control the pour on site?
Download the Quollnet Concrete Pour Log & Batch Plant Inspection Checklist to track slump, temperature, delivery time, batch tickets, and cube/cylinder samples.
Engineering note: QMix Designer is a preliminary front-end calculator using editable ACI-style absolute-volume logic and Eurocode / EN 206 style durability boundaries. It does not replace the approved project specification, laboratory trial mixes, local code requirements, material certificates, or engineer approval.