Page Not Found
Sofia Romero
Not specified
Sofia Romero holds an M.Sc. in Coastal Engineering from Delft (2018) and a B.Eng. from Andes Colombia (2014), EurIng and WEF certified; she designs eco-friendly breakwaters and is a certified scuba diver mapping coral reefs.
- Private
- Bio
-
Education & Background: Sofia holds an M.Sc. in Coastal Engineering from Delft University of Technology (2018) and a B.Eng. in Civil Engineering from Universidad de los Andes, Colombia (2014). She is EurIng-accredited and WEF Technical Specialist certified.
Career Highlights: As Coastal Resilience Lead at MarProtect, Sofia designed breakwater systems for Cartagena’s historic port, using eco-engineering techniques that enhanced marine biodiversity.
Publications & Recognition: Seven journal articles on shoreline protection with 95 000 reads; her 2020 study “Living Shorelines in the Caribbean” has 65 citations.
Beyond Work: A certified scuba diver mapping coral reefs and leading community workshops on marine conservation.
- Website
- Profile Link
- Social