G
Guest

Avatar

Lena Miller

Not specified
Lena Miller holds a B.Eng. in Electrical Engineering from MIT (2014) and is a Certified Energy Manager; at SmartGrid Innovations she deployed microgrid controls boosting renewables 22% and performs benefit concerts as a pianist.
Email
Private

Bio
Education & Credentials: Lena holds a B.Eng. in Electrical Engineering from MIT (2014) and earned her Certified Energy Manager credential.

Professional Story: She joined SmartGrid Innovations in Boston as Lead Automation Engineer, where she spearheaded the deployment of microgrid control software for five university campuses, increasing renewable integration by 22 percent.

Publications & Recognition: Lena authored two ASHRAE journal articles on demand-response systems, with 25 000 combined reads.

Outside Work: A classically trained pianist, she performs benefit concerts for children’s hospitals and coaches robotics teams at her former high school.

Current Work: Quoll Unipessoal LDA, Quollnet Branch - Operation Manager and part of the editorial team.


Website
Profile Link

Social