Inspection and Test Plan for Method Statement for Installation of Round Spiral Galvanized Steel Ductwork
AI-assisted inspection and test plan connected to a method statement, with PDF and Excel export.
More than a static template
Unlike a downloadable Word or PDF template, this ITP is an AI-assisted editable starting point directly connected to its method statement. Every inspection activity, hold point, and acceptance criterion is structured and ready to adapt to your project.
- AI-assisted customization — Tailor inspection activities and acceptance criteria to your specific project scope.
- Linked method statement — This ITP is connected to the corresponding method statement describing the work sequence.
- Multiple export formats — Download as a formatted PDF or editable Excel spreadsheet.
- Editable starting point, not a final document — Review and verify all content against your project specifications and standards before use.
What you can customize
When you save this ITP to your account, every inspection row becomes editable. You can add, remove, or modify:
- Inspection activity — Description of what is being inspected.
- Inspection type — Hold point (H), Witness point (W), Review (R), or Monitor (M).
- Responsibility — Contractor, subcontractor, engineer, or client.
- Frequency — How often the inspection occurs.
- Acceptance criteria — Referenced standard or specification requirement.
- Records — Forms, test reports, or checklists required as evidence.
Why this ITP is used
It defines who checks each installation stage and what evidence is needed before the work is concealed. It distinguishes visual seal acceptance from measured leakage acceptance.
Who uses this inspection and test plan
HVAC supervisors, mechanical engineers, QA/QC inspectors, test technicians and the designated Engineer or client representative use it to verify and release the work.
When this ITP is prepared and submitted
Use it from workfront release and material receipt through support installation, joint assembly, sealing, damper checks and pre-concealment release.
Who receives or approves this ITP
Submit it through the contractor's document control process to the Engineer or client representative designated by the contract.
Inspection scope
Covers material conformity, coordination, anchors and ring brackets, sleeve engagement and fastening, VCD access and function, mastic coverage and cure, and specified leakage testing.
Typical hold, witness, and review points
Hold at workfront release and before insulation or concealment. Witness support checks, first assembled sleeve joints, cured seal inspection and applicable leakage tests as scheduled in the approved ITP.
Typical inspection records
Retain material inspection requests, support and anchor logs, joint and seal checklists, damper function sheets, photographs, applicable test reports, and signed releases.
Important approval note
This ITP is an AI-assisted editable starting point, not a pre-approved document. Before use on any project, all inspection activities, hold points, and acceptance criteria must be reviewed and approved by the relevant parties (superintendent, principal contractor, or client representative) in accordance with your contract and project quality plan.
Always verify acceptance criteria against your applicable drawings, specifications, and regulatory requirements. Hold points must be confirmed with the relevant authority before work proceeds past that point.
Inspection and test plan
| Activity | Inspection / Test | Acceptance Criteria | Responsibility | Record |
|---|---|---|---|---|
| H — Workfront and setting-out release | Review current approvals and inspect each released workfront; check actual route, service conflicts, access and drilling restrictions. | Approved drawings and fixing details are available; clearances, elevations and access comply; conflicts are closed and required permits issued. | Mechanical Site Engineer and MEP Coordinator prepare; QA/QC verifies; designated Engineer releases. | Workfront release, coordinated drawings, setting-out sheet and permit references. |
| S — Material receipt | Inspect each delivery lot and check damper tags, duct and sleeve markings, certificates, and mastic batch and expiry. | Materials match approved submittals; mating ends and components are clean, compatible and free of damage that affects fit, sealing or use; mastic is within shelf life. | Storekeeper and QA/QC Inspector. | Material inspection request, delivery notes, certificates and batch register. |
| W — Anchors and ring bracket installation | Check each support location, bracket, rod and fixing; verify anchor parameters at installation and witness specified proof tests where required. | Approved support spacing, substrate, anchor type, embedment, edge distances and torque or cure are met. Brackets are secure and undistorted; specified proof tests pass before affected supports are loaded. | HVAC Supervisor installs and records; QA/QC verifies; Engineer witnesses as scheduled. | Anchor and hanger checklist, torque or cure logs, proof test reports where applicable. |
| W — First assembled sleeve joint; S — Production joints | Inspect engagement marks, end gap, fastener type, count and pattern before external mastic obscures the joint. | Both ends meet approved insertion and gap requirements; fastening matches approved detail; duct is aligned without deformation or damage to gaskets where fitted. | HVAC Supervisor checks every joint; QA/QC verifies; Engineer witnesses the first example of each approved joint type as scheduled. | First-installation inspection and production joint checklist. |
| S — VCD position, access and operation | Check every VCD tag, installation orientation, support, access, blade travel, indication and locking or actuator linkage. | Damper matches the schedule; casing is not distorted; blade travels freely through the full operating range; adjustment, locking and servicing are possible from approved access; powered check completed where required for final acceptance. | HVAC Supervisor and QA/QC Inspector; Controls Contractor for powered checks. | Damper inspection and function checklist; powered stroke record where applicable. |
| W — Visual sealing inspection before concealment | Inspect 100% of the circumference of joints requiring mastic; use a mirror or camera at obstructed faces. Check specified seams and penetrations and verify curing records. | Required cure completed; mastic is continuous and bonded at specified coverage, with no visible gaps, pinholes, cracks, lifting or missed sealing locations. Repairs pass reinspection. | HVAC Supervisor self-checks; QA/QC inspects; designated Engineer witnesses as scheduled. | Sealing checklist, batch and cure records, photographs and reinspection records. |
| W — Duct leakage test, where specified | Test the specified sections with calibrated instruments at the specified differential pressure and polarity after curing; record area and leakage on the approved basis. | Leakage does not exceed the contractual allowance for the test section. Failed tests are corrected and passed on retest before release. | Test Technician performs; QA/QC verifies; Engineer witnesses as scheduled. | Leakage report, section sketch, instrument calibration records and retest results. |
| H — Release before insulation and concealment | Review completed checks, test and defect closure, route and support condition, damper access, cleanliness and as-built changes for each release area. | Required inspections and applicable tests accepted; defects closed; damper access preserved; no unapproved deviation; written release issued before insulation or closure. | QA/QC submits inspection evidence; designated Engineer releases. | Signed inspection request, release register, marked-up drawings and closeout dossier. |
This table is a read-only public reference. Download the PDF or Excel version, or customize this ITP to edit it for your project.
Frequently asked questions
Related method statement
This Inspection and Test Plan is associated with the Method Statement for Installation of Round Spiral Galvanized Steel Ductwork method statement, which describes the step-by-step construction sequence, resources, materials, equipment, safety controls, and environmental controls for this activity.
View the Method Statement for Installation of Round Spiral Galvanized Steel Ductwork method statement →