G
Guest

Worker wearing a hard hat, safety glasses and reflective vest touches a metal duct support bracket anchored to a concrete ceiling while holding a clipboard with technical drawings. Similar brackets support the duct farther along. image
D
Duct Support Anchors in Concrete: Inspection Guide
construction quality assurance

Inspect duct support anchors in concrete using approved details, product instructions, embedment evidence, edge-distance measurements, and installation records.

Worker wearing a hard hat and reflective vest holds a clipboard beside a vertical metal duct supported by bolted steel brackets anchored to concrete walls. Drawings rest on a yellow guardrail in the foreground. image
V
Vertical Duct Riser Support Inspection Guide
construction quality assurance +1

Inspect floor-level duct riser brackets, anchors, load paths and alignment against approved details, with clear evidence limits and discrepancy referral.

Worker wearing a hard hat, safety glasses, gloves and reflective vest touches a bolted metal band hanger around a horizontal round duct. A threaded rod connects the hanger to a steel beam overhead. image
H
Horizontal Circular Duct Band-Hanger Inspection Guide
construction quality assurance

Inspect circular duct band hangers for strap dimensions, fastening, support spacing and local deformation using approved details and manufacturer instructions.

A worker wearing a hard hat, safety glasses and reflective vest holds plans while looking at a rectangular metal duct supported by a horizontal metal channel and threaded hanger rods. image
H
Horizontal Rectangular Duct Hanger Inspection Guide
construction quality assurance

Inspect rectangular duct hanger rods, trapeze supports, spacing, and anchorage against approved details, with clear records and deficiency closeout.

A worker in a hard hat and safety vest holds a metal end cap beside an open flat-oval duct with a black gasket. A technical drawing and a separate oval gasket lie on the table below. image
F
Flat-Oval Duct Joint Assembly Inspection Guide
construction quality assurance

Inspect flat-oval duct flange geometry, gasket continuity, fastening, and alignment using approved details, pre-closure evidence, and documented closeout.

Worker wearing a hard hat, safety glasses and reflective vest touches a circular metal duct elbow beside a tee branch. Suspended ductwork, a work light, a tablet and a duct installation drawing are visible. image
C
Circular Duct Elbow and Tee Inspection Guide
construction quality assurance

Inspect circular duct elbows and tees for correct orientation, nearby supports, and leak-resistant joints, with checks before concealment and closeout.

A worker wearing a cap bends beside a large cylindrical metal duct with raised exterior ribs, holding a corded handheld tool. Cables and hoses lie on the workshop floor. image
C
Circular Spiral Duct Seam Inspection Checklist
construction quality assurance

Inspect circular spiral duct seam engagement, surface damage, and specified sealing. Document access limits, defects, repairs, and unverified areas.

Inspect Aluminum Composite Panel Support Rails & Brackets image
A
Inspect Aluminum Composite Panel Support Rails & Brackets
construction quality assurance +2

Inspect aluminum composite panel support rails and brackets with an interactive checklist. Commentable steps, attach evidence, and export as PDF/Excel for compliant, traceable sign-off.

A worker wearing a white hard hat and safety glasses touches the sealed, screw-fastened flange where a round metal branch duct connects to a rectangular metal duct. image
D
Duct Branch Take-Off Connection Inspection Guide
construction quality assurance

Inspect duct branch take-off location, fitting geometry, secure attachment, and joint sealing using approved project details and manufacturer instructions.

Worker wearing a white hard hat and orange reflective shirt holds a long wand beside large metal ductwork, surrounded by vertical and horizontal pipes. image
R
Rectangular Duct Transition Inspection Checklist
construction quality assurance

Inspect rectangular duct transitions for dimensions, offsets, visible joint integrity, and clear airflow passage against approved project requirements.