G
Guest

Quollnet Ecosystem

Q

QMix Logbook

Create concrete QA/QC logs and export Excel/PDF reports.

Description: QMix Logbook is a free browser-based concrete QA/QC log tool for recording ready-mix concrete pours, batch tickets, slump, temperature, sample IDs, 7-day and 28-day t…

Also available on
qmix-logbook hero image
  • 6Built-in capabilities
  • openSign-up
  • EcosystemQuollnet listing
Capabilities

What QMix Logbook helps you do

Practical features designed for construction teams, engineers, and project workflows.

  1. 01

    Local project file

    Save your concrete QA/QC log as a .qmix file on your own drive and reload it later without storing the project in the cloud.

  2. 02

    Concrete pour records

    Record pour date, location, element, mix grade, mix code, quantity, supplier, batch plant, ticket number, truck number, and discharge times.

  3. 03

    Site test tracking

    Track slump, concrete temperature, ambient temperature, added water, admixture notes, sample IDs, sample type, and sample count.

  4. 04

    7-day and 28-day results

    Follow up concrete cube or cylinder test results and keep the acceptance status visible in one project register.

  5. 05

    Excel and PDF export

    Export the log as a formatted Excel workbook or PDF report for QA/QC records, consultant submissions, or internal project tracking.

  6. 06

    Sample project included

    Load a sample QMix project file to see how a completed concrete QA/QC log is structured before creating your own.

Product tour

See QMix Logbook in action

Real screens, straight from the app. Tap any shot to view it full size.

Screen 01
Screen 02
Screen 03
The story

About QMix Logbook

Built by Quollnet

Description: QMix Logbook is a free browser-based concrete QA/QC log tool for recording ready-mix concrete pours, batch tickets, slump, temperature, sample IDs, 7-day and 28-day test results, and acceptance status. Create a project log, save it as a local .qmix file on your own drive, reload it later, and export professional Excel or PDF reports when needed.

concrete QA/QC logbook concrete pour log tool ready mix concrete log concrete cube test register concrete test result register concrete pour record concrete batch ticket log slump test record
Good to know

Frequently asked questions

QMix Logbook is a free concrete QA/QC log tool for recording ready-mix concrete pours, batch tickets, site test results, sample IDs, and acceptance status. --- --- --- --- --- --- ---

No. The project can be saved as a .qmix file on your own drive and reloaded later from your device. --- --- --- --- --- --- ---

Yes. QMix Logbook can export the project log as a formatted Excel workbook. --- --- --- --- --- --- ---

Yes. The tool can generate a PDF report suitable for project records and QA/QC documentation. --- --- --- --- --- --- ---

You can record pour details, mix grade, ticket number, truck number, quantity, slump, temperature, sample IDs, 7-day result, 28-day result, status, and QA/QC notes. --- --- --- --- --- --- ---

Yes. The tool page includes a sample .qmix project file that can be downloaded or loaded in the tool. --- --- --- --- --- --- ---

No. QMix Logbook supports documentation only. Concrete acceptance must still follow the project specification, approved ITP, contract requirements, and engineer instructions.

Ready to try QMix Logbook?

Create concrete QA/QC logs and export Excel/PDF reports.