QMix Logbook
A front-end concrete pour QA/QC logbook for recording batch tickets, pour times, slump, temperature, added water, sample IDs, 7-day and 28-day results, and acceptance status. Save projects as JSON/qmix and export Excel, PDF, CSV.
QMix Logbook
Project file
These details are saved with the JSON file and repeated in the CSV export.
Create a new local QA/QC logbook or load an existing QMix JSON project file from your device.
Add pour record
Enter the field record from the ticket, truck and site testing. You can edit any row later.
Pour records
Search, edit, export, or save the full project file as JSON.
| Date / Time | Location | Mix | Ticket / Truck | Quantity | Slump | Temperature | Samples | Status | Actions |
|---|
New project file
Set the project information saved inside the JSON logbook and CSV export.
Pour record
Record the truck ticket, location, slump, temperature, sample IDs, and crushing results.
How to use QMix Logbook to create a concrete cube test register
Use QMix Logbook to load a sample concrete QA/QC project file, review pour records, save your own .qmix project file, and export Excel or PDF reports.
-
Download or load the sample project
Download the sample .qmix project file from the QMix Logbook page, or use the Load Sample Project button inside the tool.
-
Review the project information
Check the project name, contract number, client, contractor, consultant, inspector, unit system, and specification reference.
-
Review or edit pour records
Review the concrete pour records, including pour location, mix grade, ticket number, truck number, quantity, slump, temperature, samples, test results, status, and QA/QC notes.
-
Add your own records
Create a new project or edit the sample project by adding your own concrete pour records and test result follow-up.
-
Save your .qmix project file
Save the project as a .qmix file on your own drive so you can reload it later and continue updating the concrete QA/QC log.
-
Export Excel or PDF reports
Export the completed concrete cube test register as an Excel workbook or PDF report.