QMix Auditor
Front-end concrete delivery ticket audit tool for estimating true water-cementitious ratio, hidden aggregate moisture water, 7-day strength, 28-day strength, temperature risk, admixture effect, and QA/QC warnings.
Concrete delivery ticket strength verifier
Type the raw batch recipe from a delivery ticket or mix submittal. The tool estimates true water-cementitious ratio, hidden moisture water, projected 7-day and 28-day strength, and site temperature risk.
Batch ticket inputs
Use values per 1.00 m³ or 1.00 yd³. Enter cementitious materials separately if shown on the ticket.
Need to formalize the truck acceptance check?
Use the pour log to record delivery time, temperature, slump, cube/cylinder samples, added water, rejection notes, and batch ticket references.
Mix looks plausible
Estimated 28-day strength is above the specified target and W/CM is inside a normal structural range.
Ticket audit table
per 1.00 m³| Material | Ticket | Adjusted |
|---|