User avatar G
Guest

Avatar

Jhon Kovacis

@VibrationJhon
Jhon Kovacis earned a Ph.D. in Structural Dynamics from Cambridge (2018), UK-registered and LEED AP BD+C certified; he designs tuned-mass dampers reducing sway 25% and performs chamber music as an amateur cellist.
Email
Private

Bio
Academic Credentials & Expertise: Jhon holds a Ph.D. in Structural Dynamics from the University of Cambridge (2018) and is a Registered Structural Engineer in the UK. He also earned LEED AP BD+C certification.

Career Path: After post-doctoral work on vibration control at Cambridge, he joined WaveForm Engineering as Principal Engineer. He designed tuned-mass dampers for two Thames-side residential towers, achieving a 25 percent reduction in sway.

Scholarly Impact: With eight peer-reviewed articles and 320 000 ResearchGate views, his seminal “Active Control Systems for Tall Buildings” paper has been cited 150 times.

Off-Duty Pursuits: An amateur cellist, Jhon performs chamber music in London and mentors aspiring engineers through the Cambridge Outreach Programme.


Website
Profile Link

Social