G
Guest

Quollnet Ecosystem

QArticles's avatar Q

QArticles

Write once. Publish everywhere — perfectly optimized.

QArticles by Quollnet is a WYSIWYG article publishing tool that automatically generates SEO metadata, JSON-LD schema, Open Graph tags, and Twitter cards. Write content using a rich…

Also available on
QArticles app preview on Quollnet
  • 3007Active users
  • 13Built-in capabilities
  • shared keySign-up
  • EcosystemQuollnet listing
Capabilities

What QArticles helps you do

Practical features designed for construction teams, engineers, and project workflows.

  1. 01

    📝 WYSIWYG Editor

    Write articles using a Google-Docs-style editor with full formatting tools including headings, lists, alignment, fonts, and links.

  2. 02

    🔍 Auto SEO Metadata

    Titles, descriptions, and keywords are structured automatically for search engines.

  3. 03

    🧠 Automatic JSON-LD

    Article schema and publisher structured data are generated automatically.

  4. 04

    🌐 Open Graph Integration

    Social media previews are automatically created for Facebook, LinkedIn, and other platforms.

  5. 05

    🐦 Twitter Card Metadata

    Articles automatically generate Twitter card metadata.

  6. 06

    🖼 Hero Image Selection

    Choose a main article image that becomes the preview image for search engines and social media.

  7. 07

    📎 Attachment Manager

    Upload images and files and insert them into the article at the cursor position.

  8. 08

    ⬆ Multi-Source Upload

    Upload from camera, gallery, file storage, or clipboard.

  9. 09

    🔗 Smart File Linking

    Insert images directly into the article or add links to files such as PDF, DOCX, or XLSX.

  10. 10

    📚 FAQ Structured Data

    Add FAQs that are automatically converted into structured data for search engines.

  11. 11

    💻 HTML Editing Mode

    Advanced users can view and edit the raw HTML of the article content.

  12. 12

    ✏ Dynamic Editing

    Articles remain editable in the database and can be unpublished to modify content.

  13. 13

    🌍 AI Translation (Optional)

    GPT-5 powered translation available on request.

Product tour

See QArticles in action

Real screens, straight from the app. Tap any shot to view it full size.

Screen 01
Screen 02
Screen 03
Screen 04
The story

About QArticles

Built by Quollnet

QArticles by Quollnet is a WYSIWYG article publishing tool that automatically generates SEO metadata, JSON-LD schema, Open Graph tags, and Twitter cards. Write content using a rich text editor, attach images and files, set hero images, and publish structured articles optimized for search engines and social media.

wysiwyg article editor article publishing platform seo article generator json ld generator open graph metadata generator twitter card generator engineering article publishing structured article editor
Good to know

Frequently asked questions

QArticles is a WYSIWYG article publishing platform that automatically generates SEO metadata, structured data, and social media tags while allowing users to write content using a rich text editor. --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---

Yes. The platform automatically generates JSON-LD schema, Open Graph metadata, and Twitter card metadata based on the article information provided. --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---

Images can be uploaded through the attachment panel and inserted directly into the article or linked using the attachment tools. --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---

Users can attach images and files including PDF, DOCX, XLSX, and other documents. --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---

Yes. The article must first be unpublished, after which the content can be edited and published again. --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---

Yes. AI translation powered by GPT-5 is available upon request by contacting contact@quollnet.com.

Ready to try QArticles?

Write once. Publish everywhere — perfectly optimized.

Quoll Uniposoal LDA's avatar Q
Developer

Quoll Uniposoal LDA

contact@quollnet.com
Visit developer