Registration is closed for this application.
William Anderson
Not specified
William Anderson earned a B.Sc. in Geotechnical Engineering from Cambridge (2012) and an M.Sc. from Imperial (2016), EurGeol and ICE accredited; he designs Crossrail piling solutions and mentors undergraduates through ICE Future Leaders.
- Private
- Bio
-
Education & Credentials: William earned a B.Sc. in Geotechnical Engineering from the University of Cambridge (2012) and an M.Sc. in Infrastructure Engineering at Imperial College London (2016). He is EurGeol-certified and holds ICE accreditation.
Professional Path: William joined GeoTek Consultants, where he designed deep piling solutions for Crossrail in London. As Principal Engineer, he now oversees geotechnical assessments for major tunnels and basements across the UK.
Published Work: He has authored five technical papers on ground-structure interaction, totaling 80 000 downloads; his Crossrail case study is a course reference at Imperial College.
Leisure & Outreach: A keen hillwalker in the Lake District, William also mentors undergraduates through the ICE Future Leaders scheme.
- Website
- Profile Link
- Social