Registration is closed for this application.
Tatiana Ivanova
Not specified
Tatiana Ivanova holds a Ph.D. in Renewable Energy Systems from Moscow State (2018) and an M.Eng. from TU Berlin (2014), Certified Energy Manager and PMP®; she develops floating PV farms and exhibits STEM photography.
- Private
- Bio
-
Academic & Professional Credentials: Tatiana holds a Ph.D. in Renewable Energy Systems from Lomonosov Moscow State University (2018) and an M.Eng. in Electrical Engineering from TU Berlin (2014). She is a Certified Energy Manager and holds PMP certification.
Career Highlights: As Lead Engineer at SolarWave Technologies, Tatiana designed floating photovoltaic farms on Lake Ladoga, boosting output by 18 percent compared with land-based arrays. She now heads R\&D for tidal-solar hybrid systems.
Research Impact: Seven peer-reviewed papers with cumulative views of 120 000 on ResearchGate; her 2019 study “Optimizing Panel Tilt for Floating PV” has been cited 75 times.
Personal Pursuits: An amateur portrait photographer, she exhibits work in Moscow galleries and leads workshops for women in STEM.
- Website
- Profile Link
- Social