Registration is closed for this application.
Mei Zhang
Not specified
Mei Zhang holds a B.Eng. from Tsinghua (2015) and an M.Sc. from UCSD (2019), Certified BIM Manager and Civil 3D certified; she leads sensor-based bridge health monitoring and teaches community calligraphy workshops.
- Private
- Bio
-
Background & Credentials: Mei earned her B.Eng. in Civil Engineering from Tsinghua University (2015) and completed an M.Sc. in Structural Health Monitoring at UC San Diego (2019). She holds Certified BIM Manager and AutoCAD Civil 3D credentials.
Professional Journey: Mei joined SinoInfraTech as a junior engineer, advancing to Project Lead overseeing sensor-based health monitoring for large-span bridges. Her flagship project in Shanghai integrated wireless sensors to track fatigue cracks in real time.
Research & Publications: She has authored five peer-reviewed articles on wireless sensing networks, accumulating 85 000 reads on ResearchGate; her 2020 paper “IoT for Bridge Fatigue Assessment” is cited 60 times.
Personal Dimensions: A trained calligrapher, Mei teaches weekend workshops on the art at her community center and practices Tai Chi each morning to clear her mind before site visits.
- Website
- Profile Link
- Social