Registration is closed for this application.
Lila Malek
@FloodGuardLila | Not specified
Lila Malek earned an M.Sc. in Water Resources from Melbourne (2017) and a B.Eng. from AUB (2013), Civil 3D and PMP® certified; she led Dhaka flood-control design protecting 200K residents and competes in open-water swimming.
- Private
- Bio
-
Education & Credentials: Lila earned her M.Sc. in Water Resources Engineering from the University of Melbourne (2017) after a B.Eng. in Civil Engineering from AUB (2013). She holds AutoCAD Civil 3D and PMP credentials.
Career Highlights: As Senior Engineer at HydroFlow Solutions, she led the design of flood-control channels in Dhaka, protecting 200 000 residents from seasonal floods.
Research & Publications: Three peer-reviewed articles on urban drainage systems have 80 000+ reads on ResearchGate; her 2018 paper on modular culvert design is cited 55 times.
Personal Note: An endurance swimmer, Lila competes in open-water races and volunteers mapping flood-risk zones for NGOs.
- Website
- Profile Link
- Social