Registration is closed for this application.
Elena Petrova
Not specified
Elena Petrova holds an M.Sc. in Geotechnical Engineering from TU Delft (2013), EurGeol and ICE-accredited; she engineered Dogger Bank caisson foundations and authored nine papers with 220K+ reads as a field benchmark.
- Private
- Bio
-
Credentials & Specialty: Elena earned an M.Sc. in Geotechnical Engineering from TU Delft in 2013; she is EurGeol-certified and an ICE-accredited foundation engineer.
Offshore Wind Expertise: At North Sea Foundations she engineered a 120-pile caisson foundation for the Dogger Bank Wind Farm, ensuring platform stability under severe storm loads.
Scholarly Work: Nine peer-reviewed papers with 220,000+ reads; her study “Behavior of Suction Caissons under Dynamic Loading” is considered a field benchmark.
Outside Professional Life: Sails on the IJsselmeer and leads “Soil Science Saturdays,” interactive geotech workshops for Delft students.
- Website
- Profile Link
- Social