Registration is closed for this application.
Dmitry Volkov
@BridgeMasterDmitry | Not specified
Dmitry Volkov earned a B.Sc. in Civil Engineering from Saint Petersburg State (2010), is PMP® and AutoCAD Civil 3D certified; he managed landmark bridge retrofits and publishes technical bulletins downloaded 75K+ times.
- Private
- Bio
-
Education & Credentials: Dmitry holds a B.Sc. in Civil Engineering from Saint Petersburg State University (2010); he is PMP-certified and an AutoCAD Civil 3D Certified Professional.
Bridge Engineering Achievements: As Deputy Technical Director at NevaBridge Corp., he managed the retro-truss replacement of a 1930s landmark bridge, reducing traffic disruptions by 60 percent during construction.
Technical Publications: Five detailed bulletins on long-span bridge maintenance, downloaded over 75,000 times by industry professionals.
Personal Interests: Weekend ice-hockey defenseman and summer architectural photographer capturing historic Russian structures.
- Website
- Profile Link
- Social