Registration is closed for this application.
Aria Cohen
Not specified
Aria Cohen is a Swiss-registered Structural Engineer with an M.Sc. from ETH Zurich (2016) and LEED AP BD+C certified; she co-designed Zurich Tower’s base-isolation system and has published six papers read 180K+ times.
- Private
- Bio
-
Qualifications & Expertise: Aria holds an M.Sc. in Structural Engineering from ETH Zurich (2016), is a Registered Structural Engineer in Switzerland, and a LEED AP BD+C.
High-Rise Innovations: After working on Alpine ski-lift infrastructures, she joined AlpineBuild AG, co-designing the 60-story Zurich Tower and pioneering its base-isolation system for seismic resilience.
Research Contributions: Six peer-reviewed articles—including “Dynamic Response of Tuned Mass Dampers in Alpine Climates”—garnered 180,000+ reads and influenced European design standards.
Passions Outside Work: An avid alpine skier, Aria volunteers with Habitat for Humanity Switzerland, building affordable mountain homes.
- Website
- Profile Link
- Social