  "tool": "qmix_logbook",
  "version": "1.0.0",
  "savedAt": "2026-06-25T17:48:04.771Z",
  "project": {
    "name": "Quollnet Tower 22 - Lisbon, Portugal",
    "jobNo": "P9011",
    "client": "ADAC",
    "contractor": "Quollnet",
    "consultant": "Acme Consult",
    "inspector": "Karl Smith",
    "unitSystem": "Metric",
    "specRef": "ITP-CON-022"
  },
  "pours": [
    {
      "id": "d79b1d32-dda0-4772-93ec-6c645c0d45a1",
      "createdAt": "2026-06-25T11:33:43.511Z",
      "updatedAt": "2026-06-25T11:41:22.342Z",
      "date": "2026-06-24",
      "pourStart": "13:00",
      "pourEnd": "17:00",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "8m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plat",
      "truckNo": "TAR-52",
      "ticketNo": "TAR-52-02",
      "arrivalTime": "14:28",
      "dischargeStart": "14:28",
      "dischargeEnd": "14:34",
      "timeSinceBatching": "15 min",
      "slumpTarget": "100",
      "slumpActual": "98",
      "concreteTemp": "35",
      "ambientTemp": "40",
      "addedWater": "0 L",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "2",
      "sampleIds": "PC-FD1-01, PC-FD1-02",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "b883f477-0dc8-42cf-85ed-7927ec5f7127",
      "createdAt": "2026-06-24T23:01:36.390Z",
      "updatedAt": "2026-06-25T13:26:24.546Z",
      "date": "2026-06-24",
      "pourStart": "13:00",
      "pourEnd": "17:00",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "8m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant",
      "truckNo": "TAR-51",
      "ticketNo": "TAR-52-03",
      "arrivalTime": "14:50",
      "dischargeStart": "15:00",
      "dischargeEnd": "15:20",
      "timeSinceBatching": "20 min",
      "slumpTarget": "100",
      "slumpActual": "98",
      "concreteTemp": "35",
      "ambientTemp": "40",
      "addedWater": "0 L",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "2",
      "sampleIds": "PC-FD1-01, PC-FD1-02",
      "sevenDayResult": "30",
      "twentyEightDayResult": "50",
      "testLab": "LAB 3",
      "status": "Accepted",
      "notes": ""
    },
    {
      "id": "e81c2d43-eeb1-5783-01fc-7d756c0d45b2",
      "createdAt": "2026-06-25T11:45:10.000Z",
      "updatedAt": "2026-06-25T13:45:49.643Z",
      "date": "2026-06-24",
      "pourStart": "14:40",
      "pourEnd": "15:20",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-58",
      "ticketNo": "TAR-52-04",
      "arrivalTime": "14:40",
      "dischargeStart": "14:45",
      "dischargeEnd": "15:15",
      "timeSinceBatching": "25 min",
      "slumpTarget": "100",
      "slumpActual": "110",
      "concreteTemp": "28.5",
      "ambientTemp": "36.0",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-03A to 03F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Rejected",
      "notes": "Slump within acceptable tolerance (+/-20mm)."
    },
    {
      "id": "f92d3e54-ffc2-6894-12ad-8e867d1e56c3",
      "createdAt": "2026-06-25T11:46:15.000Z",
      "updatedAt": "2026-06-25T13:45:37.889Z",
      "date": "2026-06-24",
      "pourStart": "15:10",
      "pourEnd": "15:55",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-62",
      "ticketNo": "TAR-52-05",
      "arrivalTime": "15:05",
      "dischargeStart": "15:12",
      "dischargeEnd": "15:50",
      "timeSinceBatching": "35 min",
      "slumpTarget": "100",
      "slumpActual": "95",
      "concreteTemp": "29.0",
      "ambientTemp": "35.5",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Accepted with comments",
      "notes": "Truck delayed slightly in site traffic. Temperature high but within spec limit (<30C)."
    },
    {
      "id": "a1b2c3d4-e5f6-7a8b-9c0d-1e2f3a4b5c6d",
      "createdAt": "2026-06-25T11:47:00.000Z",
      "updatedAt": "2026-06-25T13:45:56.354Z",
      "date": "2026-06-24",
      "pourStart": "15:45",
      "pourEnd": "16:20",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-44",
      "ticketNo": "TAR-52-06",
      "arrivalTime": "15:40",
      "dischargeStart": "15:46",
      "dischargeEnd": "16:15",
      "timeSinceBatching": "28 min",
      "slumpTarget": "100",
      "slumpActual": "105",
      "concreteTemp": "28.2",
      "ambientTemp": "35.0",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "NCR opened",
      "notes": ""
    },
    {
      "id": "b2c3d4e5-f6a7-8b9c-0d1e-2f3a4b5c6d7e",
      "createdAt": "2026-06-25T11:48:10.000Z",
      "updatedAt": "2026-06-25T11:48:10.000Z",
      "date": "2026-06-24",
      "pourStart": "16:05",
      "pourEnd": "16:45",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-12",
      "ticketNo": "TAR-52-07",
      "arrivalTime": "16:02",
      "dischargeStart": "16:08",
      "dischargeEnd": "16:40",
      "timeSinceBatching": "30 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "28.0",
      "ambientTemp": "34.8",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "Excellent consistency."
    },
    {
      "id": "c3d4e5f6-a7b8-9c0d-1e2f-3a4b5c6d7e8f",
      "createdAt": "2026-06-25T11:49:30.000Z",
      "updatedAt": "2026-06-25T11:49:30.000Z",
      "date": "2026-06-24",
      "pourStart": "16:30",
      "pourEnd": "17:15",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-09",
      "ticketNo": "TAR-52-08",
      "arrivalTime": "16:25",
      "dischargeStart": "16:32",
      "dischargeEnd": "17:10",
      "timeSinceBatching": "42 min",
      "slumpTarget": "100",
      "slumpActual": "80",
      "concreteTemp": "28.9",
      "ambientTemp": "34.2",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-04A to 04F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Pending",
      "notes": "Slump low due to site waiting time, but acceptable within lower limit."
    },
    {
      "id": "d4e5f6a7-b89c-0d1e-2f3a-4b5c6d7e8f9a",
      "createdAt": "2026-06-25T11:50:45.000Z",
      "updatedAt": "2026-06-25T11:50:45.000Z",
      "date": "2026-06-24",
      "pourStart": "17:00",
      "pourEnd": "17:35",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 2",
      "truckNo": "TAR-33",
      "ticketNo": "TAR-52-09",
      "arrivalTime": "16:55",
      "dischargeStart": "17:02",
      "dischargeEnd": "17:32",
      "timeSinceBatching": "22 min",
      "slumpTarget": "100",
      "slumpActual": "115",
      "concreteTemp": "27.6",
      "ambientTemp": "33.5",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "Dispatched from backup Plant 2. Check mix ticket code."
    },
    {
      "id": "e5f6a7b8-9c0d-1e2f-3a4b-5c6d7e8f9a0b",
      "createdAt": "2026-06-25T11:51:50.000Z",
      "updatedAt": "2026-06-25T11:51:50.000Z",
      "date": "2026-06-24",
      "pourStart": "17:25",
      "pourEnd": "18:05",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-58",
      "ticketNo": "TAR-52-10",
      "arrivalTime": "17:20",
      "dischargeStart": "17:26",
      "dischargeEnd": "18:01",
      "timeSinceBatching": "26 min",
      "slumpTarget": "100",
      "slumpActual": "105",
      "concreteTemp": "27.4",
      "ambientTemp": "33.0",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "Truck TAR-58 returned for second rotation."
    },
    {
      "id": "f6a7b89c-0d1e-2f3a-4b5c-6d7e8f9a0b1c",
      "createdAt": "2026-06-25T11:53:00.000Z",
      "updatedAt": "2026-06-25T11:53:00.000Z",
      "date": "2026-06-24",
      "pourStart": "17:50",
      "pourEnd": "18:30",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "12m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-70",
      "ticketNo": "TAR-52-11",
      "arrivalTime": "17:45",
      "dischargeStart": "17:51",
      "dischargeEnd": "18:25",
      "timeSinceBatching": "31 min",
      "slumpTarget": "100",
      "slumpActual": "90",
      "concreteTemp": "27.1",
      "ambientTemp": "32.4",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-05A to 05F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Pending",
      "notes": "12m3 high-capacity trailer truck."
    },
    {
      "id": "a7b89c0d-1e2f-3a4b-5c6d-7e8f9a0b1c2d",
      "createdAt": "2026-06-25T11:54:15.000Z",
      "updatedAt": "2026-06-25T11:54:15.000Z",
      "date": "2026-06-24",
      "pourStart": "18:15",
      "pourEnd": "18:50",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-62",
      "ticketNo": "TAR-52-12",
      "arrivalTime": "18:10",
      "dischargeStart": "18:16",
      "dischargeEnd": "18:47",
      "timeSinceBatching": "24 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "26.9",
      "ambientTemp": "31.8",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "TAR-62 second rotation."
    },
    {
      "id": "b89c0d1e-2f3a-4b5c-6d7e-8f9a0b1c2d3e",
      "createdAt": "2026-06-25T11:55:20.000Z",
      "updatedAt": "2026-06-25T11:55:20.000Z",
      "date": "2026-06-24",
      "pourStart": "18:40",
      "pourEnd": "19:20",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-44",
      "ticketNo": "TAR-52-13",
      "arrivalTime": "18:35",
      "dischargeStart": "18:41",
      "dischargeEnd": "19:16",
      "timeSinceBatching": "29 min",
      "slumpTarget": "100",
      "slumpActual": "95",
      "concreteTemp": "26.5",
      "ambientTemp": "31.2",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "9c0d1e2f-3a4b-5c6d-7e8f-9a0b1c2d3e4f",
      "createdAt": "2026-06-25T11:56:40.000Z",
      "updatedAt": "2026-06-25T11:56:40.000Z",
      "date": "2026-06-24",
      "pourStart": "19:05",
      "pourEnd": "19:40",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-12",
      "ticketNo": "TAR-52-14",
      "arrivalTime": "19:00",
      "dischargeStart": "19:06",
      "dischargeEnd": "19:37",
      "timeSinceBatching": "33 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "26.2",
      "ambientTemp": "30.5",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-06A to 06F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Pending",
      "notes": "Night pour setup completed. Lighting units active."
    },
    {
      "id": "0d1e2f3a-4b5c-6d7e-8f9a-0b1c2d3e4f5a",
      "createdAt": "2026-06-25T11:57:55.000Z",
      "updatedAt": "2026-06-25T11:57:55.000Z",
      "date": "2026-06-24",
      "pourStart": "19:30",
      "pourEnd": "20:05",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-09",
      "ticketNo": "TAR-52-15",
      "arrivalTime": "19:25",
      "dischargeStart": "19:31",
      "dischargeEnd": "20:02",
      "timeSinceBatching": "25 min",
      "slumpTarget": "100",
      "slumpActual": "110",
      "concreteTemp": "25.9",
      "ambientTemp": "30.0",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "1e2f3a4b-5c6d-7e8f-9a0b-1c2d3e4f5a6b",
      "createdAt": "2026-06-25T11:59:10.000Z",
      "updatedAt": "2026-06-25T11:59:10.000Z",
      "date": "2026-06-24",
      "pourStart": "19:55",
      "pourEnd": "20:35",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 2",
      "truckNo": "TAR-35",
      "ticketNo": "TAR-52-16",
      "arrivalTime": "19:50",
      "dischargeStart": "19:56",
      "dischargeEnd": "20:31",
      "timeSinceBatching": "38 min",
      "slumpTarget": "100",
      "slumpActual": "85",
      "concreteTemp": "26.3",
      "ambientTemp": "29.7",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "Plant 2 delivery. Slump slightly low due to transit distance."
    },
    {
      "id": "2f3a4b5c-6d7e-8f9a-0b1c-2d3e4f5a6b7c",
      "createdAt": "2026-06-25T12:00:25.000Z",
      "updatedAt": "2026-06-25T12:00:25.000Z",
      "date": "2026-06-24",
      "pourStart": "20:20",
      "pourEnd": "20:55",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-58",
      "ticketNo": "TAR-52-17",
      "arrivalTime": "20:15",
      "dischargeStart": "20:21",
      "dischargeEnd": "20:52",
      "timeSinceBatching": "23 min",
      "slumpTarget": "100",
      "slumpActual": "105",
      "concreteTemp": "25.6",
      "ambientTemp": "29.4",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-07A to 07F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "3a4b5c6d-7e8f-9a0b-1c2d-3e4f5a6b7c8d",
      "createdAt": "2026-06-25T12:01:40.000Z",
      "updatedAt": "2026-06-25T12:01:40.000Z",
      "date": "2026-06-24",
      "pourStart": "20:45",
      "pourEnd": "21:25",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "12m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-70",
      "ticketNo": "TAR-52-18",
      "arrivalTime": "20:40",
      "dischargeStart": "20:47",
      "dischargeEnd": "21:21",
      "timeSinceBatching": "27 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "25.4",
      "ambientTemp": "29.1",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": "12m3 load."
    },
    {
      "id": "4b5c6d7e-8f9a-0b1c-2d3e-4f5a6b7c8d9e",
      "createdAt": "2026-06-25T12:02:50.000Z",
      "updatedAt": "2026-06-25T12:02:50.000Z",
      "date": "2026-06-24",
      "pourStart": "21:10",
      "pourEnd": "21:45",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-62",
      "ticketNo": "TAR-52-19",
      "arrivalTime": "21:05",
      "dischargeStart": "21:11",
      "dischargeEnd": "21:42",
      "timeSinceBatching": "21 min",
      "slumpTarget": "100",
      "slumpActual": "110",
      "concreteTemp": "25.2",
      "ambientTemp": "28.8",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "5c6d7e8f-9a0b-1c2d-3e4f-5a6b7c8d9e0f",
      "createdAt": "2026-06-25T12:04:10.000Z",
      "updatedAt": "2026-06-25T12:04:10.000Z",
      "date": "2026-06-24",
      "pourStart": "21:35",
      "pourEnd": "22:10",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-44",
      "ticketNo": "TAR-52-20",
      "arrivalTime": "21:30",
      "dischargeStart": "21:36",
      "dischargeEnd": "22:07",
      "timeSinceBatching": "29 min",
      "slumpTarget": "100",
      "slumpActual": "95",
      "concreteTemp": "25.1",
      "ambientTemp": "28.5",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "Yes",
      "sampleType": "Cubes",
      "sampleCount": "6",
      "sampleIds": "PC-FD1-08A to 08F",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "Third Party Lab",
      "status": "Pending",
      "notes": "Final sampling set for foundation zone 1."
    },
    {
      "id": "6d7e8f9a-0b1c-2d3e-4f5a-6b7c8d9e0f1a",
      "createdAt": "2026-06-25T12:05:20.000Z",
      "updatedAt": "2026-06-25T12:05:20.000Z",
      "date": "2026-06-24",
      "pourStart": "22:00",
      "pourEnd": "22:30",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-12",
      "ticketNo": "TAR-52-21",
      "arrivalTime": "21:55",
      "dischargeStart": "22:01",
      "dischargeEnd": "22:27",
      "timeSinceBatching": "34 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "24.9",
      "ambientTemp": "28.2",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "7e8f9a0b-1c2d-3e4f-5a6b-7c8d9e0f1a2b",
      "createdAt": "2026-06-25T12:06:30.000Z",
      "updatedAt": "2026-06-25T12:06:30.000Z",
      "date": "2026-06-24",
      "pourStart": "22:20",
      "pourEnd": "22:50",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "10m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-09",
      "ticketNo": "TAR-52-22",
      "arrivalTime": "22:15",
      "dischargeStart": "22:21",
      "dischargeEnd": "22:47",
      "timeSinceBatching": "26 min",
      "slumpTarget": "100",
      "slumpActual": "105",
      "concreteTemp": "24.8",
      "ambientTemp": "28.0",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "None",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "Pending",
      "notes": ""
    },
    {
      "id": "8f9a0b1c-2d3e-4f5a-6b7c-8d9e0f1a2b3c",
      "createdAt": "2026-06-25T12:07:45.000Z",
      "updatedAt": "2026-06-25T13:45:21.984Z",
      "date": "2026-06-24",
      "pourStart": "22:40",
      "pourEnd": "23:10",
      "location": "Foundation Zone 1",
      "element": "Pile cap",
      "mixGrade": "C40",
      "mixCode": "AD Mix 012",
      "quantity": "6m3",
      "supplier": "AD RMIX",
      "batchPlant": "Plant 1",
      "truckNo": "TAR-33",
      "ticketNo": "TAR-52-23",
      "arrivalTime": "22:38",
      "dischargeStart": "22:42",
      "dischargeEnd": "23:07",
      "timeSinceBatching": "22 min",
      "slumpTarget": "100",
      "slumpActual": "100",
      "concreteTemp": "24.7",
      "ambientTemp": "27.8",
      "addedWater": "",
      "admixture": "Retarder",
      "samplesTaken": "No",
      "sampleType": "",
      "sampleCount": "0",
      "sampleIds": "",
      "sevenDayResult": "",
      "twentyEightDayResult": "",
      "testLab": "",
      "status": "NCR opened",
      "notes": "Balance load to complete pour item. Total volume pour successful."
    }
  ]
}