Imagine the chaos of a construction project without a reliable snag list management tool. Learn how the Snaghere app can save inspectors from the pitfalls of manual tracking, missed deadlines, and compromised quality control.
Snag list is the inspector nightmare in defect detection, collection and distribution

Snag list, aka punch list workflow:

Snag list is a list of non-conformance detected by the inspector during an inspection visit. The inspector is most of the time part of the supervision team but can be any of the of the following:

  • Third party quality control company
  • Authority such as civil defense, municipality …
  • Supervision team such as consultant, architects …
  • Contractor while inspecting the work of subcontractors
  • The workflow is lengthy especially when we are talking about large projects. The traditional way:

    The inspector team visits the site and collect all defects by performing visual inspections, running tests or doing measurements.

    The collection of the data is the major task in the preparation of the snag list. Every defect detected is recorded by taking one or more photographs, writing a description, specifying the location, the activity and the contractor responsible for the repair of such defect. Sometimes a snippet of the project specification is attached to this sang.

    The data collected need to be sorted in may orders.

  • By contractor. This sort is needed to send these snags to the related contractor
  • By location. This sort is required to identify the location with most defect.
  • By Division. This sort gives an idea of which part of the project was not managed properly and which engineers are to follow up.
  • The data is sent to the appropriate contractor for repair. Each contractor will reply to the inspector. Now the inspector team should sort the data in new orders:

  • In progress
  • Accepted (completed)
  • Rejected
  • Challenged (a defect challenged by the contractor)
  • This process will continue until after all snags are completed. Traditionally, the inspectors use applications such as excel, word, numbers, sheets to perform these tasks. Meetings are held periodically to update the data and provide new sort orders. With snaghere.com, or snaghere application, these tasks are fully automated. The data can be collected, sorted, and sent to the related repair teams (contractors or subcontractors) automatically. The repair contractor in tern will update the state of his work. The data gets updated to the app and shared with the inspectors