Registration is closed for this application.
Zahra Esfahani
@CoastalZahra | Not specified
Zahra Esfahani earned an M.Sc. in Water Resources from Sharif (2016) and a B.Eng. from AUB (2012), Civil 3D and PMP® certified; she designs urban stormwater plans reducing floods 35% and runs coding workshops for girls.
- Private
- Bio
-
Education & Credentials: Zahra completed her M.Sc. in Water Resources Engineering at Sharif University of Technology (2016) after a B.Eng. in Civil Engineering from AUB (2012). She holds AutoCAD Civil 3D and PMP certifications.
Professional Journey: As Flood Resilience Specialist at MEGAR Consultants, Zahra designed an urban stormwater management plan for Tehran’s southern districts, reducing flood events by 35 percent. She later led regional water-supply assessments for the UNDP.
Research & Publications: Three peer-reviewed articles on adaptive drainage systems with 45 000 cumulative reads; her 2018 study on real-time flood forecasting is cited 40 times.
Community Engagement: Zahra runs free weekend coding workshops for girls in STEM and enjoys traditional Persian tile art on weekends.
- Website
- Profile Link
- Social