Registration is closed for this application.
Yuki Takahashi
Not specified
Yuki Takahashi holds a B.Eng. in Civil & Environmental Engineering from Kyoto (2013) and an M.Sc. from KAIST (2017), LEED AP and PMP® certified; she leads digital-twin simulations for Shinkansen viaducts and teaches shodo calligraphy.
- Private
- Bio
-
Academic & Professional Credentials: Yuki holds a B.Eng. in Civil and Environmental Engineering from Kyoto University (2013) and earned an M.Sc. in Smart Infrastructure at KAIST, South Korea (2017). She is LEED AP and PMP-certified.
Career Highlights: As Digital Twin Lead at Fujita Corporation, Yuki developed a real-time simulation platform for Tokyo’s Shinkansen viaducts, reducing inspection time by 40 percent.
Thought Leadership: Five conference papers on AI-driven infrastructure monitoring, with over 60 000 views on IEEE Xplore; she regularly speaks at the Japan Smart City Forum.
Personal Interests: A calligrapher skilled in shodo, Yuki teaches traditional arts to local students and practices kendo.
- Website
- Profile Link
- Social