Registration is closed for this application.
wael ali
Not specified
Wael Ali holds a B.Sc. in Mechanical Engineering from AUB (2013) and an M.Sc. from ETH Zurich (2017), RIA Certified Robotics Engineer and PMP®; he pioneered brick-laying drones and maintains terrace beehives donating honey.
- Private
- Bio
-
Academic & Professional Credentials: Wael holds a B.Sc. in Mechanical Engineering from AUB (2013) and an M.Sc. in Robotics and Automation from ETH Zurich (2017). He is a Certified Robotics Engineer (RIA) and PMP-certified.
Career Highlights: At RoboConstruct Labs, Wael developed autonomous bricklaying drones that increased wall-building speed by 30 percent on pilot sites in Switzerland. He now leads global R\&D for robotic construction systems.
Thought Leadership: Five IEEE conference papers on construction robotics, viewed 65 000 times; his keynote at ICRA 2023 on “AI-Driven On-Site Robotics” was live-streamed to 10 000 viewers.
Personal Note: An avid beekeeper, Wael maintains hives on his Zurich terrace and donates honey to local food banks.
- Website
- Profile Link
- Social