Registration is closed for this application.
Priya Sharma
@KathakPriya | Not specified
Priya Sharma earned an M.Eng. from IIT Delhi (2016) and a B.Eng. from Manipal (2013), Chartered Engineer and PMP® certified; she led cable-stayed bridge design winning national awards and performs Kathak dance.
- Private
- Bio
-
Credentials & Focus: Priya holds an M.Eng. in Structural Engineering from the Indian Institute of Technology Delhi (2016) and a B.Eng. from Manipal Institute of Technology (2013). She is a Chartered Engineer (India) and PMP-certified.
Professional Path: At Skyline Infra, Priya led the design of a cable-stayed pedestrian bridge in Gurugram, overseeing every stage from finite-element analysis to on-site erection. The project won a national engineering excellence award.
Scholarly Reach: Four conference papers on lightweight composite materials with over 35 000 views on IEEE Xplore; her collaborative study “Hybrid Fiber Composites” is cited 50 times.
Personal Touch: A trained classical dancer, Priya performs Kathak recitals and volunteers teaching dance in underprivileged schools.
- Website
- Profile Link
- Social