Registration is closed for this application.
Miguel Garcia
@GeoMiguel | Not specified
Miguel Garcia earned a Ph.D. in Geotechnical Engineering from Granada (2017) and a B.Eng. from UPC (2012), EurGeol and ICE certified; he pioneered low-vibration pile-driving methods and performs flamenco guitar at charity concerts.
- Private
- Bio
-
Education & Expertise: Miguel holds a Ph.D. in Geotechnical Engineering from the University of Granada (2017) and a B.Eng. from the Polytechnic University of Catalonia (2012). He is EurGeol-certified and ICE-accredited in foundation design.
Career Path: As Senior Geotechnical Engineer at IberDrill, Miguel led soil-structure interaction studies for high-rise foundations in Madrid’s expanding business district, pioneering a low-vibration pile-driving method.
Scholarly Impact: Eight journal articles, collectively read over 150 000 times, with his work “Predictive Modeling of Liquefaction Risk” cited 95 times. Miguel also serves on the editorial board of the Journal of Geotechnical Engineering.
Life Outside Work: An amateur flamenco guitarist, he performs in local festivals and organizes charity concerts supporting seismic-resilience education in Andalusia.
- Website
- Profile Link
- Social