Registration is closed for this application.
Mateo Gonzalez
@AndesRiderMateo | Not specified
Mateo Gonzalez earned a B.Eng. in Structural Engineering from Chile (2014) and a Certificate from Caltech (2018), Registered Structural Engineer; he designed base-isolated libraries in seismic zones and teaches rural students engineering principles.
- Private
- Bio
-
Credentials & Expertise: Mateo holds a B.Eng. in Structural Engineering from Universidad de Chile (2014) and is a Registered Structural Engineer. He also earned a Certificate in Earthquake Engineering from Caltech (2018).
Professional Path: At AndesStructures, he designed base-isolated library buildings in Santiago’s seismic zones, ensuring post-quake usability and winning national design awards.
Publications & Community: Mateo published two articles in the Latin American Journal of Seismology, with 20 000 reads, and leads youth outreach teaching engineering principles in rural schools.
Hobbies: A mountain biker in the Andes foothills, he organizes local eco-rides to promote trail conservation.
- Website
- Profile Link
- Social