Registration is closed for this application.
Lena Miller
Not specified
Lena Miller holds a B.Eng. in Electrical Engineering from MIT (2014) and is a Certified Energy Manager; at SmartGrid Innovations she deployed microgrid controls boosting renewables 22% and performs benefit concerts as a pianist.
- Private
- Bio
-
Education & Credentials: Lena holds a B.Eng. in Electrical Engineering from MIT (2014) and earned her Certified Energy Manager credential.
Professional Story: She joined SmartGrid Innovations in Boston as Lead Automation Engineer, where she spearheaded the deployment of microgrid control software for five university campuses, increasing renewable integration by 22 percent.
Publications & Recognition: Lena authored two ASHRAE journal articles on demand-response systems, with 25 000 combined reads.
Outside Work: A classically trained pianist, she performs benefit concerts for children’s hospitals and coaches robotics teams at her former high school.
- Website
- Profile Link
- Social