Registration is closed for this application.
kamal tarek
@EcoArcKamal | Not specified
Kamal Tarek earned a B.Eng. in Architectural Engineering from Cairo (2012) and an M.Sc. from Michigan (2016), LEED AP and WELL AP certified; he retrofitted Cairo Tower for 25% energy savings and performs jazz guitar.
- Private
- Bio
-
Education & Credentials: Kamal earned a B.Eng. in Architectural Engineering from Cairo University (2012) and an M.Sc. in Sustainable Design at the University of Michigan (2016). He holds LEED AP and WELL AP certifications.
Professional Path: As Design Director at EcoArc Studio, Kamal led the green retrofit of Cairo Tower, improving energy efficiency by 25 percent. He later advised on bioclimatic design guidelines for Egypt’s New Administrative Capital.
Publications & Impact: Six articles in Sustainable Architecture Review, with total reads of 55 000; his 2017 paper on passive cooling in arid climates has been cited 48 times.
Off-Duty Interests: A jazz guitarist, Kamal performs at Cairo’s cultural hubs and mentors architecture students in sustainable design studios.
- Website
- Profile Link
- Social