Registration is closed for this application.
Jihad ahmad
@Jihad Ahmad | Not specified
Jihad Ahmad holds a Ph.D. in Geotechnical Earthquake Engineering from Stanford (2019), Certified Foundation Engineer and Civil 3D certified; he leads liquefaction-mitigation designs and organizes Bay Area school earthquake drills.
- Private
- Bio
-
Education & Credentials: Jihad completed his Ph.D. in Geotechnical Earthquake Engineering at Stanford University (2019), holds a Certified Foundation Engineer (ICE) credential, and an AutoCAD Civil 3D certification.
Professional Experience: As Geotech Lead at QuakeSafe Consulting, he oversaw liquefaction-mitigation designs for major ports in California, ensuring resilience against seismic events.
Research Contributions: Author of six journal articles on soil-structure interaction, Jihad’s work has garnered 280 000 reads on ResearchGate; his 2019 study “Dynamic Soil-Foundation Responses” is cited 90 times.
Community Engagement: He organizes annual earthquake-drill workshops for Bay Area schools and enjoys trail running in the Santa Cruz Mountains.
- Website
- Profile Link
- Social