Registration is closed for this application.
Ines Oliveira
Not specified
Ines Oliveira holds a B.Sc. in Architecture from Porto (2011) and an M.Sc. in Sustainable Design from Delft (2015), LEED AP and WELL AP certified; she founded EcoForm Studio, reducing office energy use 60% and hosts design salons.
- Private
- Bio
-
Education & Certifications: Ines holds a B.Sc. in Architecture from the University of Porto (2011) and earned an M.Sc. in Sustainable Design from Delft University of Technology (2015). She is LEED AP and WELL AP certified.
Career Journey: She founded EcoForm Studio in Lisbon, creating net-zero office interiors for tech startups. Her flagship project—the Lisbon Innovation Hub—achieved a 60 percent reduction in operational energy use.
Thought Leadership: Ines has written seven articles for Green Building Magazine; her 2018 piece on biophilic design has been shared over 80 000 times online.
Personal Tastes: A voracious reader of Portuguese poetry, she hosts monthly salons blending literature with design discussions.
- Website
- Profile Link
- Social