Registration is closed for this application.
Hugo Fernandez
@TransitTechHugo | Not specified
Hugo Fernandez graduated in Civil Engineering from UBA (2013) and earned a Master’s at Berkeley (2017), PMP® and AutoCAD certified; he designed BRT corridors raising capacity 35% and runs a popular Latin America street-life blog.
- Private
- Bio
-
Credentials & Early Career: Hugo graduated from Universidad de Buenos Aires in 2013 with a B.Sc. in Civil Engineering and completed a Master’s in Transportation Planning at UC Berkeley (2017). He is PMP-certified and holds an AutoCAD Civil 3D credential.
Professional Impact: At MetroFlow Consultants, Hugo designed bus rapid-transit corridors in Santiago, improving peak-hour capacity by 35 percent. He now oversees multimodal transit studies for Lima’s new metro line.
Publications & Recognition: His 2020 study “Optimizing Bus Headways in Urban Corridors” was published in Transportation Research Record and has 50 000+ downloads.
Off-Duty Interests: A keen photographer, Hugo documents urban street life across Latin America and shares insights on his well-followed blog.
- Website
- Profile Link
- Social